PORTA-CAMSS
Live / Applied — Third extension granted (statement of use) (as of 31 Jan 2026)
What this means for you
Not registered yet, but its 05 Sept 2023 filing date beats anything filed after it. If it registers, the owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 98164519
- Mark type
- Stylized text
- Filed
- 05 Sept 2023
- Published for opposition
- 11 Jun 2024
- Attorney of record
- Frank L. Bernstein
Goods and services
- Class 006 — Metal goods: Modular fabric covered buildings made substantially of metal; Modular metal structures with flexible covers for agricultural, commercial or industrial storage; Portable buildings made primarily of metal; Portable fabric covered buildings made substantially of metal; Portable metal structures with flexible covers for agricultural, commercial or industrial storage; Prefabricated buildings made substantially of metal; Prefabricated fabric covered buildings made substantially of metal; Prefabricated metal structures with flexible covers for agricultural, commercial or industrial storage
- Class 019 — Non-metallic building materials: Non-metal decks; Non-metal floors; Non-metal shelter structures; Modular non-metal structures with flexible covers for agricultural, commercial or industrial storage; Portable non-metal buildings; Prefabricated non-metal buildings; Prefabricated non-metal structures with flexible covers for agricultural, commercial or industrial storage
Owner
- California Industrial Facilities Resources, Inc., Kirkland, WA, US
- California Industrial Facilities Resources, Inc., Kirkland, WA, US
Prosecution history
- 31 Jan 2026 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 31 Jan 2026 — SOU EXTENSION 3 GRANTED
- 30 Jan 2026 — SOU EXTENSION 3 FILED
- 30 Jan 2026 — SOU TEAS EXTENSION RECEIVED
- 06 Aug 2025 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 05 Aug 2025 — SOU EXTENSION 2 GRANTED
- 05 Aug 2025 — SOU EXTENSION 2 FILED
- 05 Aug 2025 — SOU TEAS EXTENSION RECEIVED
- 04 Feb 2025 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 03 Feb 2025 — SOU EXTENSION 1 GRANTED
- 03 Feb 2025 — SOU EXTENSION 1 FILED
- 03 Feb 2025 — SOU TEAS EXTENSION RECEIVED
- 06 Aug 2024 — NOA E-MAILED - SOU REQUIRED FROM APPLICANT
- 11 Jun 2024 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 11 Jun 2024 — PUBLISHED FOR OPPOSITION