DEVLINKS
Live / Applied — Suspended — suspension check completed, case still suspended (as of 07 Jul 2025)
What this means for you
Not registered yet, but its 18 Jul 2023 filing date beats anything filed after it. If it registers, the owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 98090195
- Mark type
- Stylized text
- Filed
- 18 Jul 2023
- Attorney of record
- Carrie L. Kiedrowski
Goods and services
- Class 007 — Machines and machine tools: Contract machines, namely, milling machines and lathing machines
- Class 037 — Building construction and repair services: Installation of building automation equipment; installation of instrumentation systems and components, namely Human-Machine Interface (HMI) programming, Programmable Logic Controller (PLC), circuit breakers, safety control relays, main power disconnect; installation, maintenance and repair of automated industrial machinery; installation, maintenance, repair and reconditioning of industrial machinery; machinery retrofit and conversion services; providing technical support, namely, technical advice concerning the installation, repair and maintenance of robotic apparatus, equipment and devices used for automated or partly automated industrial operations; technical support services for automation systems, namely, troubleshooting in the nature of repairs of system component, namely, HMI programming, PLC, circuit breakers, safety control relays, main power disconnect; repair of tools and robotic equipment, namely, tools and robotic equipment, that are part of automated manufacturing systems.
- Class 039 — Transportation and storage services: Materials handling services, namely, sorting, packaging and storage of robotic components and robots.
- Class 040 — Treatment of materials: Custom build-to-print manufacturing, assembly and installation services of custom equipment for manufacturing, namely, end-of-arm tools, in-mold labeling, vision inspection systems, and electrical controllers; injection molding, namely, insert molding, mold load and unload, and In-Mold-Labelling (IML) of robotic components and robots.
- Class 042 — Scientific and technological services: Mechanical engineering; electrical engineering; controls engineering; industrial engineering; implementation and IT project management services for others in the field of automation technology; assembly in the nature of custom manufacturing, inspection, of robotic components and robots; consulting services in the field of mechanical, electrical, controls and industrial engineering and automation and robotic solutions for industrial purposes; consulting in the field of mechanical, electrical, control and industrial engineering; custom design and engineering of machines, machine retrofits, custom devices and industrial products, namely end-of-arm tools, in-mold labeling, vision inspection systems, and electrical controllers; industrial automation hardware and software, printed circuit boards, and embedded firmware; engineering design services; engineering drawing services; engineering services; engineering services, namely, engineering for the manufacturing of prototypes, drafting of computer aided design drawings, production of patent drawings, rendering of mechanical animations, production of product documentation, and reverse engineering of products; research and development of new products for others; design and development services, namely, design and development of systems and components for industrial robots; design and development of robotic software and hardware systems; design and development of computer programs for controlling robots and robotic machinery; technical research in the field of automated robotic machinery; advice and information with respect to automation, namely, providing technology information in the fields of robotics automation and industrial robotic machinery; technical advice relating to operation of computers for use in automation; providing technology information regarding automation of production processes; computer programming; computer hardware development; computer software development; industrial engineering consultancy in the field of industrial automation; computer systems analysis; design, development, writing, installation, programming, updating, testing, implementation, and maintenance of software for others, in particular, of operating software for industrial robots and industrial automation systems; design, planning, engineering, and testing of industrial automation systems and components for others; development of computer programs for use in automated manufacturing; design, engineering, inspection and testing services for others in the field of instrumentation, automation and robotic systems; calibration and verification of instrumentation services; commissioning and start-up, namely, factory acceptance testing (FAT), programing and configuring computer systems for others, specifically as relates to programable logic controllers (PLCs), distributed control systems (DCS), and safety interlock systems; technical support services for automation systems, namely, troubleshooting of system component, namely, Human-Machine Interface (HMI) programming, Programmable Logic Controller (PLC), circuit breakers, safety control relays, main power disconnect and of computer software problems
Owner
- John Henry Foster Minnesota, Inc., Eagan, MN, US
Prosecution history
- 28 Jan 2026 — SUSPENSION CHECKED - TO ATTORNEY FOR ACTION
- 07 Jul 2025 — REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED
- 08 Jan 2025 — REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED
- 10 May 2024 — NOTIFICATION OF LETTER OF SUSPENSION E-MAILED
- 10 May 2024 — LETTER OF SUSPENSION E-MAILED
- 10 May 2024 — SUSPENSION LETTER WRITTEN
- 01 May 2024 — TEAS/EMAIL CORRESPONDENCE ENTERED
- 30 Apr 2024 — CORRESPONDENCE RECEIVED IN LAW OFFICE
- 30 Apr 2024 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
- 30 Jan 2024 — APPLICATION EXTENSION GRANTED/RECEIPT PROVIDED
- 30 Jan 2024 — APPLICATION EXTENSION TO RESPONSE PERIOD - RECEIVED
- 30 Oct 2023 — NOTIFICATION OF NON-FINAL ACTION E-MAILED
- 30 Oct 2023 — NON-FINAL ACTION E-MAILED
- 30 Oct 2023 — NON-FINAL ACTION WRITTEN
- 28 Oct 2023 — ASSIGNED TO EXAMINER