DLIME
Live / Applied — Second extension granted (statement of use) (as of 23 Sept 2025)
What this means for you
Not registered yet, but its 13 Jul 2023 filing date beats anything filed after it. If it registers, the owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 98082946
- Mark type
- Stylized text
- Filed
- 13 Jul 2023
- Published for opposition
- 30 Jul 2024
- Attorney of record
- Rachelle A. Dubow, Esq.
Goods and services
- Class 019 — Non-metallic building materials: Building and construction materials and elements, not of metal, namely, semi-worked woods; Shelter structures and transportable buildings, not of metal; Building and construction materials and elements, namely, pitch, tar, bitumen or asphalt; Building and construction materials and elements, namely, sand, natural stone, clay slabs, non-metallic minerals and concrete; Stone, clay slabs and non-metallic minerals for building or construction; Spackling compound; Building and construction materials and elements, namely, rock materials used in building flooring, roofing, countertops, walls, cladding and fireplaces
Owner
Prosecution history
- 24 Mar 2026 — SOU TEAS EXTENSION RECEIVED
- 24 Sept 2025 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 23 Sept 2025 — SOU EXTENSION 2 GRANTED
- 23 Sept 2025 — SOU EXTENSION 2 FILED
- 23 Sept 2025 — SOU TEAS EXTENSION RECEIVED
- 21 Mar 2025 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 20 Mar 2025 — SOU EXTENSION 1 GRANTED
- 20 Mar 2025 — SOU EXTENSION 1 FILED
- 20 Mar 2025 — SOU TEAS EXTENSION RECEIVED
- 24 Sept 2024 — NOA E-MAILED - SOU REQUIRED FROM APPLICANT
- 30 Jul 2024 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 30 Jul 2024 — PUBLISHED FOR OPPOSITION
- 10 Jul 2024 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
- 25 Jun 2024 — APPROVED FOR PUB - PRINCIPAL REGISTER
- 24 Jun 2024 — TEAS/EMAIL CORRESPONDENCE ENTERED