N NATIONAL POWER SMARTER, NONSTOP POWER.
Live / Applied — Third extension granted (statement of use) (as of 27 Mar 2026)
What this means for you
Not registered yet, but its 06 Jul 2023 filing date beats anything filed after it. If it registers, the owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 98073503
- Mark type
- Design + words
- Filed
- 06 Jul 2023
- Published for opposition
- 06 Aug 2024
- Attorney of record
- Jeffrey J. Nein
Goods and services
- Class 009 — Scientific and electric apparatus: Charging stations for electric vehicles; Electrical apparatus, namely, charging stations for charging electric vehicles; Apparatus for charging batteries and vehicle batteries, namely, battery charging devices for motor vehicles, charging stations for electric vehicles, battery charge devices
- Class 035 — Advertising and business services: Retail store services and wholesale distributorships featuring electric power generators and standby power equipment, mobile electric power generators, uninterruptible power supplies, surge protectors, electrical power distributions units, DC power generation equipment, DC electrical distribution equipment, electrical generator monitoring equipment, DC power monitoring equipment, power distribution monitoring equipment, and uninterruptible power supply monitoring equipment; Outsourcing services in the nature of arranging service contracts for others
- Class 036 — Insurance and financial services: Extended warranty services, namely, service contracts; Providing extended warranties on electric power generators, mobile electric power generators, uninterruptible power supplies, surge protectors, electrical power distributions units, DC power generation equipment, DC electrical distribution equipment, electrical generator monitoring equipment, DC power monitoring equipment, power distribution monitoring equipment, and uninterruptible power supply monitoring equipment
- Class 037 — Building construction and repair services: Installation, maintenance, and repair of uninterruptible power supplies, electric power generators and standby power equipment, mobile electric power generators, surge protectors, electrical power distributions units, structured cabling, outside plant fiber optic cabling, DC power generation equipment, AC electrical power generation equipment, DC electrical distribution equipment, HVAC systems, wireless communication equipment, solar panels for production of electricity, electric vehicle charging stations, and energy storage systems; Maintenance and repair of outside plant fiber optic facilities; Storm restoration services in the field of storm, water, hail, and wind damage; Construction, maintenance and repair of data center and head-end data transmission facilities, and solar panels; Charging of electric vehicles; Vehicle battery charging; Charging station services for electric vehicles; Installation of wiring and power supply equipment for transmission and distribution of electricity suitable for electric vehicle recharging stations; Installation of wiring and power supply equipment for others for the transmission, distribution and monitoring of electricity for electric vehicle charging stations; Installation, maintenance, and repair of electric vehicle charging stations and computer networking hardware; Technical consulting services related to the installation, maintenance and repair of electrical charging stations for electric vehicles; Technical consulting services related to the installation of electrical charging stations for vehicles; Rental of standby power equipment, namely, rental of portable battery chargers for electric vehicles, rental of portable power chargers
- Class 040 — Treatment of materials: Rental of mobile electric power generating equipment; Rental of standby power equipment, namely, rental of power-generating equipment
- Class 042 — Scientific and technological services: Design of DC power systems, AC electrical systems, electric power generators and standby power equipment, data center and head-end data transmission facilities, structured cabling systems, outside plant fiber optic cabling facilities, wireless communication facilities, solar panels for production of electricity, electric vehicle charging stations, and energy storage systems for others; Engineering services for others in the field of DC power systems, AC electrical systems, electric power generators and standby power equipment, data center and head-end data transmission facilities, structured cabling systems, HVAC systems, outside plant fiber optic cabling facilities, wireless communication facilities, solar panels for production of electricity, electric vehicle charging stations, and energy storage systems; Remote monitoring of the functioning and use of electrical equipment, namely, electric power generators and standby power equipment, and electric vehicle charging stations; Remote monitoring of the functioning and use of electrical equipment, namely, electric vehicle charging stations and related vehicle charging apparatus; Technological planning and consulting services in the field of electrical charging hardware for vehicles; Technological consultation in the field of selecting electrical charging hardware for vehicles suitable for their intended uses
Owner
- National Power, LLC, Raleigh, NC, US
- National Power, LLC, Raleigh, NC, US
Prior registrations
Prosecution history
- 28 Mar 2026 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 27 Mar 2026 — SOU EXTENSION 3 GRANTED
- 27 Mar 2026 — SOU EXTENSION 3 FILED
- 27 Mar 2026 — SOU TEAS EXTENSION RECEIVED
- 01 Oct 2025 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 30 Sept 2025 — SOU EXTENSION 2 GRANTED
- 30 Sept 2025 — SOU EXTENSION 2 FILED
- 30 Sept 2025 — SOU TEAS EXTENSION RECEIVED
- 29 Mar 2025 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 29 Mar 2025 — SOU EXTENSION 1 GRANTED
- 28 Mar 2025 — SOU EXTENSION 1 FILED
- 28 Mar 2025 — SOU TEAS EXTENSION RECEIVED
- 01 Oct 2024 — NOA E-MAILED - SOU REQUIRED FROM APPLICANT
- 06 Aug 2024 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 06 Aug 2024 — PUBLISHED FOR OPPOSITION