N ASSETVISION BY NATIONAL POWER N
Live / Applied — Third extension granted (statement of use) (as of 27 Mar 2026)
What this means for you
Not registered yet, but its 06 Jul 2023 filing date beats anything filed after it. If it registers, the owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 98073465
- Mark type
- Design + words
- Filed
- 06 Jul 2023
- Published for opposition
- 06 Aug 2024
- Attorney of record
- Jeffrey J. Nein
Goods and services
- Class 009 — Scientific and electric apparatus: Downloadable application programming interface (API) software; Downloadable software for monitoring and tracking energy and critical infrastructure assets maintenance and performance across multiple locations; Recorded computer software for use as an application programming interface (API); Recorded software for monitoring and tracking energy and critical infrastructure assets maintenance and performance across multiple locations; Recorded software for monitoring the maintenance and performance of generators, DC power systems, battery systems, HVAC systems, AC electrical systems, fire suppression systems, uninterruptible power supply (UPS) systems, telemetry systems, data center facilities, commercial facilities, industrial facilities, head-end facilities, and wireless communication facilities
- Class 042 — Scientific and technological services: Providing temporary use of online, non-downloadable software for monitoring the maintenance and performance of generators, DC power systems, battery systems, HVAC systems, AC electrical systems, fire suppression systems, uninterruptible power supply (UPS) systems, telemetry systems, data center facilities, commercial facilities, industrial facilities, head-end facilities, and wireless communication facilities; Providing temporary use of online, non-downloadable cloud-based software for us as an application program interface (API); Providing temporary use of online, non-downloadable cloud-based software for monitoring and tracking energy and critical infrastructure assets maintenance and performance across multiple locations
Owner
- National Power, LLC, Raleigh, NC, US
- National Power, LLC, Raleigh, NC, US
Prior registrations
Prosecution history
- 28 Mar 2026 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 27 Mar 2026 — SOU EXTENSION 3 GRANTED
- 27 Mar 2026 — SOU EXTENSION 3 FILED
- 27 Mar 2026 — SOU TEAS EXTENSION RECEIVED
- 01 Oct 2025 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 30 Sept 2025 — SOU EXTENSION 2 GRANTED
- 30 Sept 2025 — SOU EXTENSION 2 FILED
- 30 Sept 2025 — SOU TEAS EXTENSION RECEIVED
- 29 Mar 2025 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 29 Mar 2025 — SOU EXTENSION 1 GRANTED
- 28 Mar 2025 — SOU EXTENSION 1 FILED
- 28 Mar 2025 — SOU TEAS EXTENSION RECEIVED
- 01 Oct 2024 — NOA E-MAILED - SOU REQUIRED FROM APPLICANT
- 06 Aug 2024 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 06 Aug 2024 — PUBLISHED FOR OPPOSITION