FEDERAL ENGINEERING & TESTING, INC.

Live / Allowed — Notice of allowance issued (as of 10 Jun 2025)

What this means for you

Approved and waiting on proof of use. It will register unless the applicant drops it, and its 03 Jul 2023 filing date already counts against anyone who files later.

Record

Serial number
98069344
Mark type
Design + words
Filed
03 Jul 2023
Published for opposition
15 Apr 2025
Attorney of record
Sharon Urias

Goods and services

  • Class 037 — Building construction and repair services: Well drilling; structural and building inspections and plan reviews of remedial recommendations for structural systems related thereto for others in the course of building construction
  • Class 042 — Scientific and technological services: Engineering services, namely, geotechnical engineering; structural engineering; mechanical engineering; electrical engineering; environmental engineering; construction quality control of others, namely, inspection and materials testing of concrete, masonry, soils, asphalt paving, metals, roofs, thresholds, pavement, coatings, and stucco; electronic monitoring of vibration using computers or sensors for quality control purposes; engineering services, namely, laboratory testing and analysis of materials in the nature of construction materials, building materials, and soil samples in the field of construction; testing, analysis, and evaluation of construction materials to assure compliance with building code standards; geological surveys and research; seismic analysis services; environmental surveying; testing, analysis and evaluation of the goods of others to determine conformity with certification standards; engineering services for the analysis of soil structures

Owner

Prosecution history

  • 04 Dec 2025 — TEAS STATEMENT OF USE RECEIVED
  • 04 Dec 2025 — SOU TEAS EXTENSION RECEIVED
  • 10 Jun 2025 — NOA E-MAILED - SOU REQUIRED FROM APPLICANT
  • 15 Apr 2025 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
  • 15 Apr 2025 — PUBLISHED FOR OPPOSITION
  • 09 Apr 2025 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
  • 19 Mar 2025 — APPROVED FOR PUB - PRINCIPAL REGISTER
  • 12 Feb 2025 — TEAS/EMAIL CORRESPONDENCE ENTERED
  • 12 Feb 2025 — CORRESPONDENCE RECEIVED IN LAW OFFICE
  • 12 Feb 2025 — TEAS REQUEST FOR RECONSIDERATION RECEIVED
  • 19 Nov 2024 — NOTIFICATION OF FINAL REFUSAL EMAILED
  • 19 Nov 2024 — FINAL REFUSAL E-MAILED
  • 19 Nov 2024 — FINAL REFUSAL WRITTEN
  • 21 Oct 2024 — TEAS/EMAIL CORRESPONDENCE ENTERED
  • 21 Oct 2024 — CORRESPONDENCE RECEIVED IN LAW OFFICE

View this trademark record on Marksy