HOMETECH CONSTRUCTION & DESIGN
Live / Applied — Suspended — suspension check completed, case still suspended (as of 07 Aug 2025)
What this means for you
Not registered yet, but its 15 Jun 2023 filing date beats anything filed after it. If it registers, the owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 98045014
- Mark type
- Stylized text
- Filed
- 15 Jun 2023
- Attorney of record
- Benjamin Laski
Goods and services
- Class 042 — Scientific and technological services: Interior design services; Architectural and engineering services for the construction of buildings; Interior decorating; Interior design consultation; exterior design services; Interior design consultation; Interior design services; Interior design services including space planning, furniture selection, material and surface selection; Providing a website featuring information in the field of interior design; Real estate staging services for the purpose of increasing the appeal of the property to prospective buyers and/or renters; Planning and layout design services for interior spaces; Providing graphic design services to create specialty interior environment settings; providing temporary use of online non-downloadable software for use in 3D interior design and space planning of furnishings and decorations in interior spaces
Owner
- HomeTech Construction & Design, Inc., Santa Monica, CA, US
Prosecution history
- 07 Aug 2025 — REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED
- 07 Aug 2025 — SUSPENSION CHECKED - TO ATTORNEY FOR ACTION
- 07 Feb 2025 — REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED
- 03 Jul 2024 — NOTIFICATION OF LETTER OF SUSPENSION E-MAILED
- 03 Jul 2024 — LETTER OF SUSPENSION E-MAILED
- 03 Jul 2024 — SUSPENSION LETTER WRITTEN
- 19 Jun 2024 — TEAS/EMAIL CORRESPONDENCE ENTERED
- 19 Jun 2024 — CORRESPONDENCE RECEIVED IN LAW OFFICE
- 19 Jun 2024 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
- 20 Mar 2024 — NOTIFICATION OF NON-FINAL ACTION E-MAILED
- 20 Mar 2024 — NON-FINAL ACTION E-MAILED
- 20 Mar 2024 — NON-FINAL ACTION WRITTEN
- 20 Mar 2024 — LETTER OF PROTEST EVIDENCE REVIEWED - ACTION TAKEN
- 11 Mar 2024 — ASSIGNED TO EXAMINER
- 05 Mar 2024 — ASSIGNED TO EXAMINER