TREATY OAK CLEAN ENERGY
Live / Applied — Third extension granted (statement of use) (as of 24 Nov 2025)
What this means for you
Not registered yet, but its 31 May 2023 filing date beats anything filed after it. If it registers, the owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 98021232
- Mark type
- Stylized text
- Filed
- 31 May 2023
- Published for opposition
- 02 Apr 2024
- Attorney of record
- Amy Brozenic
Goods and services
- Class 037 — Building construction and repair services: Construction, installation, maintenance and repair of solar energy power plants, solar energy systems, solar energy generation equipment and solar energy products; Construction, installation, maintenance and repair of wind energy facilities, wind energy systems, wind energy generation equipment and wind energy products
- Class 040 — Treatment of materials: Solar energy generation services; production of solar energy; technical consulting in the field of solar energy production; generation of power through operation of solar power generation equipment and facilities; wind energy generation services; production of wind energy; technical consulting in the field of wind energy production; generation of power through operation of wind power generation equipment and facilities
- Class 042 — Scientific and technological services: Design and engineering services in the field of solar energy power plants, solar energy systems, solar energy generation equipment and solar energy products; designing and testing of solar power energy products for others; research and development in the field of solar energy; design and engineering services in the field of wind energy facilities, wind energy systems, wind energy generation equipment and wind energy products; designing and testing of wind power energy products for others; research and development in the field of wind energy
Owner
- Treaty Oak Clean Energy, LLC, Austin, TX, US
- Treaty Oak Clean Energy, LLC, Austin, TX, US
Prosecution history
- 25 Nov 2025 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 24 Nov 2025 — SOU EXTENSION 3 GRANTED
- 24 Nov 2025 — SOU EXTENSION 3 FILED
- 24 Nov 2025 — SOU TEAS EXTENSION RECEIVED
- 20 May 2025 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 19 May 2025 — SOU EXTENSION 2 GRANTED
- 19 May 2025 — SOU EXTENSION 2 FILED
- 19 May 2025 — SOU TEAS EXTENSION RECEIVED
- 03 Mar 2025 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 21 Nov 2024 — SOU EXTENSION 1 GRANTED
- 20 Nov 2024 — SOU EXTENSION 1 FILED
- 20 Nov 2024 — SOU TEAS EXTENSION RECEIVED
- 04 Jun 2024 — NOA E-MAILED - SOU REQUIRED FROM APPLICANT
- 02 Apr 2024 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 02 Apr 2024 — PUBLISHED FOR OPPOSITION