STARGENA

Live / Applied — Third extension granted (statement of use) (as of 19 Feb 2026)

What this means for you

Not registered yet, but its 31 May 2023 filing date beats anything filed after it. If it registers, the owner can stop confusingly similar uses in the classes it covers.

Record

Serial number
98020983
Mark type
Stylized text
Filed
31 May 2023
Published for opposition
02 Jul 2024
Attorney of record
Darra Loganzo

Goods and services

  • Class 007 — Machines and machine tools: Electricity generators
  • Class 009 — Scientific and electric apparatus: Electricity storage apparatus, namely, batteries; batteries, electric, for vehicles; fuel cells; electric power supplies, other than electricity generators
  • Class 035 — Advertising and business services: Billing services in the field of energy; commercial administration of the licensing of energy services of others; Consultancy in the field of energy efficiency
  • Class 037 — Building construction and repair services: Construction of energy and power generating installations being power plant structures
  • Class 039 — Transportation and storage services: Distribution and storage of electricity; storage and distribution of electricity; Public utility services, namely, supply of electricity
  • Class 040 — Treatment of materials: Generation of energy; leasing of energy generating equipment; production of electrical energy from renewable sources; custom manufacturing services for others in the field of aeronautical and space vehicles
  • Class 042 — Scientific and technological services: Engineering services in the field of energy technology; scientific research in the field of energy; technological consultancy in the field of alternative energy generation; technological consultancy in the field of aerospace engineering
  • Class 045 — Legal and security services: Licensing of industrial property rights in the field of energy services; licensing of intellectual property rights in the field of energy services

Owner

Prosecution history

  • 20 Feb 2026 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
  • 19 Feb 2026 — SOU EXTENSION 3 GRANTED
  • 19 Feb 2026 — SOU EXTENSION 3 FILED
  • 19 Feb 2026 — SOU TEAS EXTENSION RECEIVED
  • 22 Aug 2025 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
  • 21 Aug 2025 — SOU EXTENSION 2 GRANTED
  • 21 Aug 2025 — SOU EXTENSION 2 FILED
  • 21 Aug 2025 — SOU TEAS EXTENSION RECEIVED
  • 27 Feb 2025 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
  • 27 Feb 2025 — SOU EXTENSION 1 GRANTED
  • 26 Feb 2025 — SOU EXTENSION 1 FILED
  • 26 Feb 2025 — SOU TEAS EXTENSION RECEIVED
  • 27 Aug 2024 — NOA E-MAILED - SOU REQUIRED FROM APPLICANT
  • 02 Jul 2024 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
  • 02 Jul 2024 — PUBLISHED FOR OPPOSITION