GENERAC
Live / Allowed — Published for opposition (as of 17 Mar 2026)
What this means for you
Approved and waiting on proof of use. It will register unless the applicant drops it, and its 19 May 2023 filing date already counts against anyone who files later.
Record
- Serial number
- 98005120
- Mark type
- Design + words
- Filed
- 19 May 2023
- Published for opposition
- 17 Mar 2026
- Attorney of record
- Danielle I. Mattessich
Goods and services
- Class 009 — Scientific and electric apparatus: Apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling the distribution or use of electricity; apparatus for recording, transmitting, and reproducing sound, images or data; recorded media, namely, electronic database in the field of power generation recorded on computer media; downloadable computer software used to remotely monitor and control residential and industrial generators; blank digital or analogue recording and storage media, namely, electronic storage media; automatic transfer switches (ats); batteries and battery chargers; home energy battery storage systems comprised of batteries, power inverters, and battery storage cabinets for storing the batteries; renewable battery system to provide backup power; circuit breakers; electronic devices, namely, energy meters for tracking and monitoring energy usage; control and measuring apparatus and instruments, namely, computer-controlled apparatus for testing and measuring power signals, not for medical purposes; electric control panels; downloadable computer software for accessing information on generators, light towers, heaters and pumps, and portable water trailers; downloadable computer software for monitoring live home power consumption, power generation, and renewable battery systems; electric control devices for energy management; energy monitors for tracking, controlling and monitoring energy usage, namely, energy meters for tracking and monitoring energy usage; electric power extension cords; power extension cords for generators; load controllers for managing power consumption, namely, load banks; electric welding apparatus and electric arc welding apparatus, namely, electric batteries; electrical power distribution panels; electrical power extension cords for power generators; electronic devices, namely, energy monitors for tracking and monitoring energy usage; electronic load controllers for managing power consumption, namely, load banks; electronic modules that facilitate the monitoring and management of power consumption for use with standby generators and transfer switches in the nature of computers; electronic modules that facilitate the monitoring and management of power consumption for use with standby generators and transfer switches in the nature of computers; fuses for electric current; home energy battery storage systems comprised of batteries, power inverters, and battery storage cabinets for storing the batteries; inverters; monitoring devices for monitoring fuel levels in propane tanks; power distribution inlet boxes for connecting portable generators to transfer switches; renewable battery system to provide backup power; surge protectors; electric switches, electric transfer switches, automatic transfer switches; water temperature gauges; uninterruptable power systems, namely, medium voltage power distribution and protection component system composed of breakers and switchgears; wireless controllers to remotely monitor and control the function and status of other electrical, electronic, and mechanical devices or systems, namely, energy systems; electrical distribution control boxes; electrical transfer switches; engine-driven battery chargers; electric switches, automatic transfer switches and automatic transfer switches being parts of machines; and structural fittings being structural parts for all the aforesaid goods
Owner
- Generac Power Systems, Inc., Waukesha, WI, US
- Generac Power Systems, Inc., Waukesha, WI, US
Prior registrations
Prosecution history
- 17 Mar 2026 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 17 Mar 2026 — PUBLISHED FOR OPPOSITION
- 11 Mar 2026 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
- 19 Feb 2026 — APPROVED FOR PUB - PRINCIPAL REGISTER
- 06 Jan 2026 — TEAS/EMAIL CORRESPONDENCE ENTERED
- 06 Jan 2026 — CORRESPONDENCE RECEIVED IN LAW OFFICE
- 06 Jan 2026 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
- 01 Nov 2025 — NOTIFICATION OF NON-FINAL ACTION E-MAILED
- 01 Nov 2025 — NON-FINAL ACTION E-MAILED
- 01 Nov 2025 — NON-FINAL ACTION WRITTEN
- 03 Sept 2025 — PREVIOUS ALLOWANCE COUNT WITHDRAWN
- 19 Aug 2025 — WITHDRAWN FROM PUB - OG REVIEW QUERY
- 18 Jul 2025 — APPROVED FOR PUB - PRINCIPAL REGISTER
- 17 Jul 2025 — TEAS/EMAIL CORRESPONDENCE ENTERED
- 17 Jul 2025 — CORRESPONDENCE RECEIVED IN LAW OFFICE