HANWHA CONVERGENCE
Live / Registered — Registered (as of 10 Jun 2025)
What this means for you
Registered since 10 Jun 2025. The owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 97925835
- Registration number
- 7827734
- Mark type
- Design + words
- Filed
- 08 May 2023
- Published for opposition
- 02 Apr 2024
- Registered
- 10 Jun 2025
- Attorney of record
- B. Joe Kim
Goods and services
- Class 037 — Building construction and repair services: Installation, maintenance and repair of electronic monitoring apparatus for solar power generation facilities and energy storage facilities; Installation, maintenance and repair of electrical and electronic apparatus for use in the field of automation in the nature of solar panels, solar installations for generating power, solar collectors, photovoltaic modules, and air conditioning systems; repair and maintenance of photovoltaic power generation installations; Installation, maintenance and repair of photovoltaic equipment for electricity generation
- Class 039 — Transportation and storage services: Storage, distribution and supply of energy and fuel
- Class 040 — Treatment of materials: Production of solar energy through photovoltaic power generation plants and equipment
- Class 042 — Scientific and technological services: Engineering consultancy in the field of prediction and optimal management of building energy; Computer programming of electronic control systems; software engineering services
Owner
- Hanwha Corporation, Seoul, KR
- Hanwha Corporation, Seoul, KR
- Hanwha Corporation, Seoul, KR
Prosecution history
- 10 Jun 2025 — NOTICE OF REGISTRATION CONFIRMATION EMAILED
- 10 Jun 2025 — REGISTERED-PRINCIPAL REGISTER
- 22 May 2025 — NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED
- 22 May 2025 — ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED
- 22 May 2025 — EXAMINER'S AMENDMENT ENTERED
- 22 May 2025 — NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED
- 22 May 2025 — EXAMINERS AMENDMENT E-MAILED
- 22 May 2025 — SU-EXAMINER'S AMENDMENT WRITTEN
- 19 Feb 2025 — NOTIFICATION OF NON-FINAL ACTION E-MAILED
- 19 Feb 2025 — NON-FINAL ACTION E-MAILED
- 19 Feb 2025 — SU - NON-FINAL ACTION - WRITTEN
- 28 Jan 2025 — STATEMENT OF USE PROCESSING COMPLETE
- 12 Nov 2024 — USE AMENDMENT FILED
- 28 Jan 2025 — CASE ASSIGNED TO INTENT TO USE PARALEGAL
- 12 Nov 2024 — TEAS STATEMENT OF USE RECEIVED