CUBY
Live / Registered — Registered (as of 03 Mar 2026)
What this means for you
Registered since 03 Mar 2026. The owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 97903607
- Registration number
- 8161789
- Mark type
- Design + words
- Filed
- 24 Apr 2023
- Published for opposition
- 28 May 2024
- Registered
- 03 Mar 2026
- Attorney of record
- Mark A. Jansen
Goods and services
- Class 006 — Metal goods: Building panels of metal; Construction elements made of metal, namely, fabricated metal components for building foundations; Construction materials, namely, metal piles; Door frames of metal; Frames of metal for building; Framework of metal for building; Metal building materials, namely, ceiling boards and floor boards; Metal canopies; Metal facade panels for construction purposes; Metal partitions for building; Metal reinforcement materials for building; Window frames of metal
- Class 019 — Non-metallic building materials: Building materials, namely, composite panels composed primarily of nonmetal materials; Building panels, not of metal; Concrete building materials, namely, blocks, posts, panels; Construction materials, namely, non-metal flooring materials; Door frames, not of metal; Framework for building, not of metal; Glass for building; Non-metal facade panels for construction purposes; Non-metal partitions for building; Reinforced glass for building; Reinforcing materials, not of metal, for building; Window frames, not of metal; Window panes for buildings; Wooden building materials, namely, boards, decking, railings
Owner
- CUBY TECHNOLOGIES, INC., New York, NY, US
- CUBY TECHNOLOGIES, INC., New York, NY, US
- CUBY TECHNOLOGIES, INC., New York, NY, US
Prosecution history
- 03 Mar 2026 — NOTICE OF REGISTRATION CONFIRMATION EMAILED
- 03 Mar 2026 — REGISTERED-PRINCIPAL REGISTER
- 06 Feb 2026 — NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED
- 06 Feb 2026 — ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED
- 01 Feb 2026 — STATEMENT OF USE PROCESSING COMPLETE
- 23 Jan 2026 — USE AMENDMENT FILED
- 23 Jan 2026 — TEAS STATEMENT OF USE RECEIVED
- 15 Jan 2026 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 14 Jan 2026 — SOU EXTENSION 2 GRANTED
- 23 Jun 2025 — SOU EXTENSION 2 FILED
- 14 Jan 2026 — DIVISIONAL PROCESSING COMPLETE
- 24 Jun 2025 — DIVISIONAL REQUEST RECEIVED
- 09 Jan 2026 — CASE ASSIGNED TO INTENT TO USE PARALEGAL
- 26 Dec 2025 — CASE ASSIGNED TO INTENT TO USE PARALEGAL
- 24 Jun 2025 — TEAS STATEMENT OF USE RECEIVED