L

Live / Applied — First extension granted (statement of use) (as of 14 Jul 2025)

What this means for you

Not registered yet, but its 21 Apr 2023 filing date beats anything filed after it. If it registers, the owner can stop confusingly similar uses in the classes it covers.

Record

Serial number
97900353
Mark type
Word mark
Filed
21 Apr 2023
Published for opposition
03 Dec 2024
Attorney of record
Douglas H. Elliott

Goods and services

  • Class 007 — Machines and machine tools: Equipment used in oil and gas well production and drilling services, namely, pumps in the nature of electric pumps, pump accessories in the nature of valves, switches, and sensors for the operation of electric pumps, pump structural components for the operation of electric pumps, motors in the nature of electric motors, not for land vehicles, motor accessories in the nature of drives and sensors for the operation of electric motors, not for land vehicles, and motor structural components for the operation of electric motors, not for land vehicles; power generators in the nature of fluid-driven power generators; centrifugal pumps; submersible pumps; packet pumps in the nature of centrifugal pumps constructed of hardened alloys and high performance thermoplastics; multi-phase screw pumps; surface horizontal pumping systems comprising centrifugal pumps and electric motors for machines mounted on skids; electric submersible induction motors, not for land vehicles; electric submersible permanent magnet motors, not for land vehicles; variable frequency drives for pumping systems for use in oil and gas well production; surface power equipment in the nature of electric power generators used to provide electric power to a downhole motor, for use in oil and gas well production.
  • Class 009 — Scientific and electric apparatus: Electronic devices for monitoring wellbore data, namely measuring apparatus for measuring pressure, temperature, and vibration; electric frequency converter for controlling the speed of an electric motor, in the nature of electronic frequency converters for high velocity electric motors; electric variable speed controller for oilfield surface and downhole wellbore equipment, in the nature of electronic speed controllers; electronic controller for use in the oil and gas industry for monitoring wellbore data, data from surface equipment, and data from wellbore equipment, in the nature of electronic control systems for machines; electronic downhole sensors for detecting operating parameters downhole in a well using artificial lift; subsurface oilfield gauges, namely, gauges that can be used to detect temperature, pressure, vibration, movement of selected items, and movement in select areas of a wellbore, in the nature of gauges for detecting temperature, pressure, vibration, and movement in a wellbore
  • Class 037 — Building construction and repair services: Gas drilling services and oil drilling services; servicing oilfield equipment, namely, rebuilding and repairing worn and partially damaged electric motors and worn and partially destroyed oilfield equipment, and all in the nature of repair of oilfield equipment
  • Class 040 — Treatment of materials: Oil and gas production services
  • Class 042 — Scientific and technological services: Technological and engineering services, namely, providing technical project studies in the nature of engineering services, particularly technical project planning and design engineering for the processing of oil and gas, researching product development in the nature of product research and development, testing of oilfield equipment and their components, and designing computer software in the nature of computer software design.

Owner

Prosecution history

  • 06 Jan 2026 — SOU TEAS EXTENSION RECEIVED
  • 15 Jul 2025 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
  • 14 Jul 2025 — SOU EXTENSION 1 GRANTED
  • 14 Jul 2025 — SOU EXTENSION 1 FILED
  • 14 Jul 2025 — SOU TEAS EXTENSION RECEIVED
  • 14 Jan 2025 — NOA E-MAILED - SOU REQUIRED FROM APPLICANT
  • 03 Dec 2024 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
  • 03 Dec 2024 — PUBLISHED FOR OPPOSITION
  • 27 Nov 2024 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
  • 08 Nov 2024 — APPROVED FOR PUB - PRINCIPAL REGISTER
  • 08 Nov 2024 — EXAMINER'S AMENDMENT ENTERED
  • 08 Nov 2024 — NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED
  • 08 Nov 2024 — EXAMINERS AMENDMENT E-MAILED
  • 08 Nov 2024 — EXAMINERS AMENDMENT -WRITTEN
  • 15 Aug 2024 — NOTIFICATION OF NON-FINAL ACTION E-MAILED

View this trademark record on Marksy