BROAD REACH POWER RELIABLE. FLEXIBLE. ENERGY STORAGE.

Live / Applied — Third extension granted (statement of use) (as of 30 Dec 2025)

What this means for you

Not registered yet, but its 12 Apr 2023 filing date beats anything filed after it. If it registers, the owner can stop confusingly similar uses in the classes it covers.

Record

Serial number
97885328
Mark type
Design + words
Filed
12 Apr 2023
Published for opposition
07 May 2024
Attorney of record
Betsy Wang Lee

Goods and services

  • Class 042 — Scientific and technological services: Remote monitoring of energy storage installations to ensure proper functioning; energy usage monitoring, metering, and analysis, namely, metering and monitoring electric power consumption by third parties for electric power providers and electric meter reading and data analysis; engineering services in the field of electrical energy distribution, transmission and storage; design, development, installation and maintenance of computer software for others used in the transmission, storage and distribution of energy; technological planning and consulting services in the field of energy storage; providing engineering and product development services for others in the field of energy generation, transmission and storage; research and development of technology for others in the field of energy generation, transmission and storage; engineering design services in the field of energy generation, transmission and storage; software as a service (SaaS) services featuring non-downloadable software for use in analyzing data regarding energy usage from smart grids; providing temporary use of online non-downloadable computer software for use in the remote monitoring, analysis, management, and distribution of energy

Owner

Prior registrations

Prosecution history

  • 31 Dec 2025 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
  • 30 Dec 2025 — SOU EXTENSION 3 GRANTED
  • 30 Dec 2025 — SOU EXTENSION 3 FILED
  • 30 Dec 2025 — SOU TEAS EXTENSION RECEIVED
  • 29 Jun 2025 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
  • 28 Jun 2025 — SOU EXTENSION 2 GRANTED
  • 28 Jun 2025 — SOU EXTENSION 2 FILED
  • 28 Jun 2025 — SOU TEAS EXTENSION RECEIVED
  • 03 Mar 2025 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
  • 27 Dec 2024 — SOU EXTENSION 1 GRANTED
  • 26 Dec 2024 — SOU EXTENSION 1 FILED
  • 26 Dec 2024 — SOU TEAS EXTENSION RECEIVED
  • 02 Jul 2024 — NOA E-MAILED - SOU REQUIRED FROM APPLICANT
  • 07 May 2024 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
  • 07 May 2024 — PUBLISHED FOR OPPOSITION

View this trademark record on Marksy