PANL

Live / Applied — Fourth extension granted (statement of use) (as of 26 Mar 2026)

What this means for you

Not registered yet, but its 30 Mar 2023 filing date beats anything filed after it. If it registers, the owner can stop confusingly similar uses in the classes it covers.

Record

Serial number
97864176
Mark type
Word mark
Filed
30 Mar 2023
Published for opposition
30 Jan 2024
Attorney of record
Jeffrey J. Nein

Goods and services

  • Class 019 — Non-metallic building materials: Pre-fabricated non-metal buildings and houses; Pre-fabricated ready-to-assemble buildings and houses, not of metal; Prefabricated non-metal building assembly kits to include all components to form pre-designed single and multilevel structures, namely, single and multilevel structures featuring built-in architectural and interior design

Owner

Prosecution history

  • 27 Mar 2026 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
  • 26 Mar 2026 — SOU EXTENSION 4 GRANTED
  • 26 Mar 2026 — SOU EXTENSION 4 FILED
  • 26 Mar 2026 — SOU TEAS EXTENSION RECEIVED
  • 26 Sept 2025 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
  • 25 Sept 2025 — SOU EXTENSION 3 GRANTED
  • 25 Sept 2025 — SOU EXTENSION 3 FILED
  • 25 Sept 2025 — SOU TEAS EXTENSION RECEIVED
  • 14 Mar 2025 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
  • 13 Mar 2025 — SOU EXTENSION 2 GRANTED
  • 13 Mar 2025 — SOU EXTENSION 2 FILED
  • 13 Mar 2025 — SOU TEAS EXTENSION RECEIVED
  • 18 Sept 2024 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
  • 18 Sept 2024 — SOU EXTENSION 1 GRANTED
  • 18 Sept 2024 — SOU EXTENSION 1 FILED

View this trademark record on Marksy