NU-CEIL
Live / Applied — Response to non-final action entered (as of 17 Feb 2026)
What this means for you
Not registered yet, but its 17 Feb 2023 filing date beats anything filed after it. If it registers, the owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 97799205
- Mark type
- Stylized text
- Filed
- 17 Feb 2023
- Attorney of record
- Matthew D. Kendall
Goods and services
- Class 037 — Building construction and repair services: Concrete pump services, namely, wet shotcreting, slabjacking, pressure grouting, cellular foam concrete, self levelling concrete and epoxy base flooring; brick and masonry construction and restoration and repair services, namely, pointing, repointing and sealing; construction of small buildings, masonry walls and structures; custom building construction services; preparation and cleaning of concrete, steel and asphalt surfaces, namely sandblasting, wet sandblasting, high pressure water blasting, acid etching, shot blasting; concrete pouring and coating services in the nature of toppings, floorings, and coating services for walls, ceilings and floors; specialty construction product services, namely, grout application, epoxy application, sealer application, painting; asbestos, lead and mold abatement services; construction consultations, namely consultation in the field of temporary containment of dust and debris during construction; transportation construction consultation, namely, consultation as to the construction and construction planning of transportation infrastructure projects; Building construction services, namely, construction planning, project management and general building construction services for residential, industrial, commercial, institutional and government sectors.
Owner
- Nusens Niche Contracting Services Inc., Etobicoke, CA
Prosecution history
- 17 Feb 2026 — TEAS/EMAIL CORRESPONDENCE ENTERED
- 16 Feb 2026 — CORRESPONDENCE RECEIVED IN LAW OFFICE
- 16 Feb 2026 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
- 16 Nov 2025 — NOTIFICATION OF NON-FINAL ACTION E-MAILED
- 16 Nov 2025 — NON-FINAL ACTION E-MAILED
- 16 Nov 2025 — NON-FINAL ACTION WRITTEN
- 20 Oct 2025 — TEAS/EMAIL CORRESPONDENCE ENTERED
- 20 Oct 2025 — CORRESPONDENCE RECEIVED IN LAW OFFICE
- 20 Oct 2025 — ASSIGNED TO LIE
- 10 Oct 2025 — TEAS RESPONSE TO SUSPENSION INQUIRY RECEIVED
- 23 Jul 2025 — REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED
- 23 Jul 2025 — SUSPENSION CHECKED - TO ATTORNEY FOR ACTION
- 21 Jan 2025 — REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED
- 02 Jun 2024 — REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED
- 06 May 2024 — SUSPENSION CHECKED - TO ATTORNEY FOR ACTION