SMARTRAIL
Dead / Abandoned — Abandoned — no statement of use filed (as of 23 Mar 2026)
What this means for you
This application is over — abandoned 23 Mar 2026. The name may be available, but check before relying on it — rights can also come from actual use, not only from the register.
Record
- Serial number
- 97797344
- Mark type
- Stylized text
- Filed
- 16 Feb 2023
- Published for opposition
- 26 Dec 2023
- Abandoned
- 23 Mar 2026
- Attorney of record
- Christian P. Bodner
Goods and services
- Class 009 — Scientific and electric apparatus: Electronic monitoring devices in the nature of smartphones and tablet PCs for operating model railway systems
- Class 020 — Furniture: Showcases for the presentation of model vehicles, in particular model locomotives in operation
- Class 028 — Toys and sporting goods: Electronic control devices in the nature of remote controllers specially adapted for use with model vehicles; signaling and control installations in the nature of remote controllers for operating toy lighting fixtures for model vehicles and model railways; miniature model railway vehicles, namely, model locomotives, wagons, and trams; model railway tracks for model railway vehicles and model cars; toy trains; toy track sets for electrically operated model vehicles; toy models of lighting and railroad signaling equipment; toy model buildings; electronic games adapted for use with model railway technology and model railway systems, not being accessory devices for use with television receivers
Owner
- Modelleisenbahn GmbH, Bergheim, AT
- Modelleisenbahn GmbH, Bergheim, AT
Prosecution history
- 23 Mar 2026 — ABANDONMENT NOTICE E-MAILED - NO USE STATEMENT FILED
- 23 Mar 2026 — ABANDONMENT - NO USE STATEMENT FILED
- 12 Aug 2025 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 11 Aug 2025 — SOU EXTENSION 3 GRANTED
- 11 Aug 2025 — SOU EXTENSION 3 FILED
- 11 Aug 2025 — SOU TEAS EXTENSION RECEIVED
- 12 Feb 2025 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 12 Feb 2025 — SOU EXTENSION 2 GRANTED
- 11 Feb 2025 — SOU EXTENSION 2 FILED
- 11 Feb 2025 — SOU TEAS EXTENSION RECEIVED
- 16 Aug 2024 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 16 Aug 2024 — SOU EXTENSION 1 GRANTED
- 16 Aug 2024 — SOU EXTENSION 1 FILED
- 16 Aug 2024 — SOU TEAS EXTENSION RECEIVED
- 20 Feb 2024 — NOA E-MAILED - SOU REQUIRED FROM APPLICANT