GOALTTI
Live / Registered — Registered (as of 02 Sept 2025)
What this means for you
Registered since 02 Sept 2025. The owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 97749303
- Registration number
- 7931052
- Mark type
- Stylized text
- Filed
- 10 Jan 2023
- Published for opposition
- 07 Nov 2023
- Registered
- 02 Sept 2025
- Attorney of record
- Yong Chen
Goods and services
- Class 009 — Scientific and electric apparatus: Inverters; Accumulators, electric, for vehicles; Batteries, electric; Battery boxes; Chargers for electric batteries; Charging stations for electric vehicles; Electric accumulators; Electric cables and wires; Lithium ion batteries; Photovoltaic modules; Photovoltaic solar modules for production of electricity; Photovoltaic solar panels for the production of electricity; Photovoltaic systems that convert sunlight into electric and thermal energy; Power controllers; Power supplies; Rechargeable batteries; Renewable battery system to provide backup power; Solar panels for the production of electricity; Supercapacitors for energy storage; Voltage stabilizing power supply; Wireless chargers
Owner
- Shenzhen Portable Electronic Technology Co., Ltd, Shenzhen, Guangdong, CN
- Shenzhen Portable Electronic Technology Co., Ltd, Shenzhen, Guangdong, CN
- Shenzhen Portable Electronic Technology Co., Ltd, Shenzhen, Guangdong, CN
Prosecution history
- 02 Sept 2025 — NOTICE OF REGISTRATION CONFIRMATION EMAILED
- 02 Sept 2025 — REGISTERED-PRINCIPAL REGISTER
- 14 Aug 2025 — NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED
- 14 Aug 2025 — ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED
- 08 Aug 2025 — STATEMENT OF USE PROCESSING COMPLETE
- 30 Oct 2024 — USE AMENDMENT FILED
- 30 Oct 2024 — TEAS STATEMENT OF USE RECEIVED
- 30 Apr 2024 — NOA E-MAILED - SOU REQUIRED FROM APPLICANT
- 17 Mar 2024 — EXTENSION OF TIME TO OPPOSE PROCESS - TERMINATED
- 09 Nov 2023 — EXTENSION OF TIME TO OPPOSE RECEIVED
- 07 Nov 2023 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 07 Nov 2023 — PUBLISHED FOR OPPOSITION
- 18 Oct 2023 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
- 03 Oct 2023 — APPROVED FOR PUB - PRINCIPAL REGISTER
- 03 Oct 2023 — LETTER OF PROTEST EVIDENCE REVIEWED-NO FURTHER ACTION TAKEN