PARR OPTI-FRAME
Live / Applied — Third extension granted (statement of use) (as of 26 Jun 2025)
What this means for you
Not registered yet, but its 16 Dec 2022 filing date beats anything filed after it. If it registers, the owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 97721317
- Mark type
- Design + words
- Filed
- 16 Dec 2022
- Published for opposition
- 31 Oct 2023
- Attorney of record
- Michael A. Cohen
Goods and services
- Class 019 — Non-metallic building materials: Building materials, namely, pre-cut and prefabricated wood wall components in the nature of wood trim, boards of wood and wood posts; Structural wood products, namely, structural floor and roof trusses and joists; Non-metal wall panels and wall components, namely, wall boards; Non-metal stair parts, namely, risers, landings, handrails, guard rails and stair rails; Lumber; Non-metal decking; Non-metal fence panels
- Class 035 — Advertising and business services: Retail store services featuring building and construction materials including wall panels, wall components, lumber, and sheet goods
- Class 037 — Building construction and repair services: Consulting services in the field of construction of interior and exterior wall systems and structural framing for buildings
- Class 039 — Transportation and storage services: Delivery of goods
- Class 040 — Treatment of materials: Custom manufacturing of building and construction materials for others including wall panels, wall components, lumber, and sheet goods; Custom manufacture of wall panels and wall components to the order and specification of others
Owner
- Parr Lumber Company, Hillsboro, OR, US
- Parr Lumber Company, Hillsboro, OR, US
Prior registrations
Prosecution history
- 22 Dec 2025 — TEAS STATEMENT OF USE RECEIVED
- 27 Jun 2025 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 26 Jun 2025 — SOU EXTENSION 3 GRANTED
- 26 Jun 2025 — SOU EXTENSION 3 FILED
- 26 Jun 2025 — SOU TEAS EXTENSION RECEIVED
- 03 Mar 2025 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 21 Dec 2024 — SOU EXTENSION 2 GRANTED
- 20 Dec 2024 — SOU EXTENSION 2 FILED
- 20 Dec 2024 — SOU TEAS EXTENSION RECEIVED
- 17 Jun 2024 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 18 Jun 2024 — SOU EXTENSION 1 GRANTED
- 18 Jun 2024 — SOU EXTENSION 1 FILED
- 17 Jun 2024 — SOU TEAS EXTENSION RECEIVED
- 26 Dec 2023 — NOA E-MAILED - SOU REQUIRED FROM APPLICANT
- 31 Oct 2023 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED