IREX

Live / Registered — Registered (as of 05 Mar 2024)

What this means for you

Registered since 05 Mar 2024. The owner can stop confusingly similar uses in the classes it covers.

Record

Serial number
97698222
Registration number
7319889
Mark type
Stylized text
Filed
30 Nov 2022
Published for opposition
19 Dec 2023
Registered
05 Mar 2024
Attorney of record
Leo M. Loughlin

Goods and services

  • Class 037 — Building construction and repair services: Thermal insulation contracting services, namely, installation of thermal insulation for buildings; installation of building and mechanical insulation materials, passive fire protection material in the nature of insulation; application of industrial and commercial coatings; building construction, namely, construction of expansion joints; energy assessment services for the purpose of determining improvements needed to improve energy use and efficiency for industrial and commercial purposes; installation services of building scaffolds, working and building platforms and shoring, and rental of scaffold equipment; asbestos removal services; emergency general building contracting services in the nature of restoration services for water, flood, fire, smoke damage and for environmental containment, namely, tearing out and replacing building materials, localization, drying and cleaning of particulate and moisture contaminants for buildings and contents therein; construction of metal buildings
  • Class 040 — Treatment of materials: Chemical encapsulation and dispersion of hazardous materials

Owner

Prosecution history

  • 05 Mar 2024 — NOTICE OF REGISTRATION CONFIRMATION EMAILED
  • 05 Mar 2024 — REGISTERED-PRINCIPAL REGISTER
  • 19 Dec 2023 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
  • 19 Dec 2023 — PUBLISHED FOR OPPOSITION
  • 29 Nov 2023 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
  • 13 Nov 2023 — APPROVED FOR PUB - PRINCIPAL REGISTER
  • 09 Nov 2023 — TEAS/EMAIL CORRESPONDENCE ENTERED
  • 09 Nov 2023 — CORRESPONDENCE RECEIVED IN LAW OFFICE
  • 09 Nov 2023 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
  • 13 Sept 2023 — NOTIFICATION OF NON-FINAL ACTION E-MAILED
  • 13 Sept 2023 — NON-FINAL ACTION E-MAILED
  • 13 Sept 2023 — NON-FINAL ACTION WRITTEN
  • 08 Sept 2023 — ASSIGNED TO EXAMINER
  • 22 Dec 2022 — NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
  • 03 Dec 2022 — NEW APPLICATION ENTERED

View this trademark record on Marksy