OUTDOOR LIVING EXPERIENCE
Live / Applied — Fourth extension granted (statement of use) (as of 31 Dec 2025)
What this means for you
Not registered yet, but its 28 Nov 2022 filing date beats anything filed after it. If it registers, the owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 97694654
- Mark type
- Stylized text
- Filed
- 28 Nov 2022
- Published for opposition
- 07 Nov 2023
- Attorney of record
- Marina L. Lang
Goods and services
- Class 009 — Scientific and electric apparatus: Apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling the distribution or use of electric current; Computer hardware and recorded software systems for controlling lighting fixtures and to create, edit, store, manipulate, simulate and display artificial light, images, sound or combinations thereof; Electric control devices for lighting fixtures; Electronic regulating and control devices for the operation of light emitting diodes; LED circuit boards; Wireless controllers to remotely monitor and control the function and status of other electrical, electronic, and mechanical devices or systems, namely, lighting systems
- Class 011 — Environmental control apparatus: Electric lighting fixtures; LED (light emitting diode) lighting fixtures; LED landscape lights; LED lighting systems, namely, LED modules, power supplies, and wiring; LED luminaires; Light post luminaires; Lighting fixtures; Lights for illuminating stairs, doors and other portions of buildings
Owner
- SPJ LIGHTING, INC., Westlake Village, CA, US
- SPJ LIGHTING, INC., Westlake Village, CA, US
Prosecution history
- 01 Jan 2026 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 31 Dec 2025 — SOU EXTENSION 4 GRANTED
- 31 Dec 2025 — SOU EXTENSION 4 FILED
- 31 Dec 2025 — SOU TEAS EXTENSION RECEIVED
- 01 Jul 2025 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 30 Jun 2025 — SOU EXTENSION 3 GRANTED
- 30 Jun 2025 — SOU EXTENSION 3 FILED
- 30 Jun 2025 — SOU TEAS EXTENSION RECEIVED
- 04 Mar 2025 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 03 Jan 2025 — SOU EXTENSION 2 GRANTED
- 03 Jan 2025 — SOU EXTENSION 2 FILED
- 02 Jan 2025 — SOU TEAS EXTENSION RECEIVED
- 01 Jul 2024 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 01 Jul 2024 — SOU EXTENSION 1 GRANTED
- 01 Jul 2024 — SOU EXTENSION 1 FILED