SCENIC HILL SOLAR

Live / Registered — Registered (as of 01 Apr 2025)

What this means for you

Registered since 01 Apr 2025. The owner can stop confusingly similar uses in the classes it covers.

Record

Serial number
97691342
Registration number
7747326
Mark type
Design + words
Filed
24 Nov 2022
Published for opposition
31 Oct 2023
Registered
01 Apr 2025
Attorney of record
Susan M. Kornfield

Goods and services

  • Class 035 — Advertising and business services: Energy usage management; consulting services in the field of energy efficiency for commercial and institutional facilities; consulting services in the field of energy usage management and energy efficiency; business operation of solar energy power plants for others
  • Class 037 — Building construction and repair services: Technical construction planning of solar energy based power plants; construction, installation, maintenance, and repair of solar energy based power plants; construction, installation, maintenance, and repair of solar energy based power plants for commercial, utilities, nonprofit, and public sector use; construction, installation, maintenance, and repair of solar installations for generating electrical power; installation, maintenance, and repair of photovoltaic modules; consulting services in the field of technical construction planning and technical construction project management of the installation of solar installations for generating, distributing and supplying electricity from solar energy systems
  • Class 042 — Scientific and technological services: Design of solar energy power plants; engineering services for solar energy power plants; design services and engineering services regarding the construction, installation, and operation of solar energy power plants; consulting services in the field of the design and development of solar energy power plants; engineering services in the field of energy efficiency; consulting services in the fields of energy measurement to improve energy efficiency

Owner

Prosecution history

  • 01 Apr 2025 — NOTICE OF REGISTRATION CONFIRMATION EMAILED
  • 01 Apr 2025 — REGISTERED-PRINCIPAL REGISTER
  • 09 Mar 2025 — NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED
  • 09 Mar 2025 — ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED
  • 06 Mar 2025 — STATEMENT OF USE PROCESSING COMPLETE
  • 24 Dec 2024 — USE AMENDMENT FILED
  • 05 Mar 2025 — CASE ASSIGNED TO INTENT TO USE PARALEGAL
  • 24 Dec 2024 — TEAS STATEMENT OF USE RECEIVED
  • 13 Jun 2024 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
  • 08 Jun 2024 — SOU EXTENSION 1 GRANTED
  • 08 Jun 2024 — SOU EXTENSION 1 FILED
  • 08 Jun 2024 — SOU TEAS EXTENSION RECEIVED
  • 26 Dec 2023 — NOA E-MAILED - SOU REQUIRED FROM APPLICANT
  • 31 Oct 2023 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
  • 31 Oct 2023 — PUBLISHED FOR OPPOSITION

View this trademark record on Marksy