WORK ON CLIMATE
Live / Registered — Registered (as of 08 Aug 2023)
What this means for you
Registered since 08 Aug 2023. The owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 97661733
- Registration number
- 7134806
- Mark type
- Stylized text
- Filed
- 03 Nov 2022
- Published for opposition
- 04 Apr 2023
- Registered
- 08 Aug 2023
- Attorney of record
- Robert Devin Ricci
Goods and services
- Class 037 — Building construction and repair services: Installation, maintenance and repair of apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling electricity; Installation, maintenance and repair of apparatus for supplying electricity; installation of energy storage systems; Construction, installation, construction project management, repair and maintenance services for renewable energy facilities and energy storage facilities; Consulting services in the field of construction of renewable energy facilities and energy storage facilities
- Class 039 — Transportation and storage services: Distribution and transmission of electricity; Utility services, namely, transmission of electricity; Utility services, namely, electricity power grid load shifting; Public utility services in the nature of electricity distribution; Storage of electrical energy; Energy storage services, namely, storing, transmitting and distributing electrical energy; Providing energy storage facilities for others; Technical operation of energy storage installations for others for the purpose of physical storage and later distribution; Provision of information, advice and consultancy services relating to electrical energy distribution, transmission and storage
Owner
- Plus Power, LLC, The Woodlands, TX, US
- Plus Power, LLC, The Woodlands, TX, US
- Plus Power, LLC, The Woodlands, TX, US
Prosecution history
- 08 Aug 2023 — NOTICE OF REGISTRATION CONFIRMATION EMAILED
- 08 Aug 2023 — REGISTERED-PRINCIPAL REGISTER
- 07 Jul 2023 — NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED
- 06 Jul 2023 — ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED
- 22 Jun 2023 — STATEMENT OF USE PROCESSING COMPLETE
- 30 May 2023 — USE AMENDMENT FILED
- 22 Jun 2023 — CASE ASSIGNED TO INTENT TO USE PARALEGAL
- 30 May 2023 — TEAS STATEMENT OF USE RECEIVED
- 30 May 2023 — NOA E-MAILED - SOU REQUIRED FROM APPLICANT
- 04 Apr 2023 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 04 Apr 2023 — PUBLISHED FOR OPPOSITION
- 15 Mar 2023 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
- 25 Feb 2023 — APPROVED FOR PUB - PRINCIPAL REGISTER
- 25 Feb 2023 — EXAMINER'S AMENDMENT ENTERED
- 25 Feb 2023 — NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED