N
Live / Registered — Registered (as of 04 Feb 2025)
What this means for you
Registered since 04 Feb 2025. The owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 97644342
- Registration number
- 7681106
- Mark type
- Design + words
- Filed
- 24 Oct 2022
- Published for opposition
- 27 Feb 2024
- Registered
- 04 Feb 2025
- Attorney of record
- Cathleen E. Stadecker
Goods and services
- Class 007 — Machines and machine tools: Electricity generators, namely, renewable energy-powered electricity generators and wind-powered electricity generators
- Class 009 — Scientific and electric apparatus: Power inverters; AC-DC converters; AC-DC-AC converters; DC-AC converters; Power controllers; Wind turbine controllers, namely, electronic control systems that control the voltage and current provided from wind turbines to other connected devices and to electrical transmission and distribution systems, the rotational speed of a wind turbines, the power output of wind turbines, and the startup, shutdown, protection, monitoring, and safety operations of wind turbines; Electronic control systems for renewable based energy generation equipment, comprised of computer hardware and recorded software for controlling the voltage and current provided from a renewable energy generation source to other connected devices, the power output of an energy generation source, and the startup and shutdown operations of an energy generation source; Wind turbine control systems comprising electronic sensors, namely, rotational speed sensors, wind speed sensors, temperature sensors, pressure sensors, vibration and acceleration sensors, angular position sensors, and air density sensors, and related downloadable and recorded software for managing the power, movement and functions of wind turbines
Owner
- Northern Power Systems S.r.l., Casalecchio di Reno, IT
- Northern Power Systems S.r.l., Casalecchio di Reno, IT
- Northern Power Systems S.r.l., Casalecchio di Reno, IT
Prosecution history
- 04 Feb 2025 — NOTICE OF REGISTRATION CONFIRMATION EMAILED
- 04 Feb 2025 — REGISTERED-PRINCIPAL REGISTER
- 10 Jan 2025 — NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED
- 10 Jan 2025 — ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED
- 08 Jan 2025 — STATEMENT OF USE PROCESSING COMPLETE
- 22 Oct 2024 — USE AMENDMENT FILED
- 07 Jan 2025 — CASE ASSIGNED TO INTENT TO USE PARALEGAL
- 22 Oct 2024 — TEAS STATEMENT OF USE RECEIVED
- 23 Apr 2024 — NOA E-MAILED - SOU REQUIRED FROM APPLICANT
- 04 Mar 2024 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 27 Feb 2024 — PUBLISHED FOR OPPOSITION
- 07 Feb 2024 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
- 07 Feb 2024 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 24 Jan 2024 — APPROVED FOR PUB - PRINCIPAL REGISTER
- 22 Jan 2024 — TEAS/EMAIL CORRESPONDENCE ENTERED