BLOOM ELECTROLYZER
Live / Allowed — Notice of allowance issued (as of 06 Jan 2026)
What this means for you
Approved and waiting on proof of use. It will register unless the applicant drops it, and its 17 Oct 2022 filing date already counts against anyone who files later.
Record
- Serial number
- 97634704
- Mark type
- Stylized text
- Filed
- 17 Oct 2022
- Published for opposition
- 11 Nov 2025
- Attorney of record
- Harold Milstein
Goods and services
- Class 009 — Scientific and electric apparatus: Apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling electricity, namely, apparatus and instruments for using electricity to produce hydrogen and oxygen; computers utilized as network communication equipment with network operating system programs used with electrolysers; downloadable computer software for use in operating apparatus for conducting, switching, accumulating, regulating or controlling electricity, namely, downloadable computer software for use in monitoring, analyzing, controlling and running electrolysis equipment that utilizes electricity; downloadable computer software for recording, processing and managing data relating to conducting, switching, transforming, accumulating, regulating or controlling electricity, namely, downloadable computer software for processing and managing data relating to electrolysis equipment that utilizes electricity; electronic equipment, namely electrolysers in the nature of computer controlled electrolysis equipment and electrolysis apparatus for hydrogen and oxygen generation and electrolytic cells ; fuel cells, namely fuel cells for electrolysis, fuel cell electrodes for electrolysis
- Class 040 — Treatment of materials: Generation of energy; consultancy in the field of energy production and conversion of water and steam to fuel, electrochemical treatment, chemical processing and purification of gases
Owner
- Bloom Energy Corporation, San Jose, CA, US
- Bloom Energy Corporation, San Jose, CA, US
Prosecution history
- 06 Jan 2026 — NOA E-MAILED - SOU REQUIRED FROM APPLICANT
- 11 Nov 2025 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 11 Nov 2025 — PUBLISHED FOR OPPOSITION
- 05 Nov 2025 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
- 14 Oct 2025 — APPROVED FOR PUB - PRINCIPAL REGISTER
- 25 Jun 2025 — NOTIFICATION OF LETTER OF SUSPENSION E-MAILED
- 25 Jun 2025 — LETTER OF SUSPENSION E-MAILED
- 25 Jun 2025 — SUSPENSION LETTER WRITTEN
- 19 May 2025 — REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED
- 18 Nov 2024 — NOTIFICATION OF LETTER OF SUSPENSION E-MAILED
- 18 Nov 2024 — LETTER OF SUSPENSION E-MAILED
- 18 Nov 2024 — SUSPENSION LETTER WRITTEN
- 22 Apr 2024 — REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED
- 20 Oct 2023 — NOTIFICATION OF LETTER OF SUSPENSION E-MAILED
- 20 Oct 2023 — LETTER OF SUSPENSION E-MAILED