LSVL
Live / Registered — Registered (as of 19 Dec 2023)
What this means for you
Registered since 19 Dec 2023. The owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 97625473
- Registration number
- 7246536
- Mark type
- Stylized text
- Filed
- 10 Oct 2022
- Published for opposition
- 03 Oct 2023
- Registered
- 19 Dec 2023
- Attorney of record
- Gabrielle A. Holley
Goods and services
- Class 019 — Non-metallic building materials: Building timber; sawn timber; worked timber; timber building products, namely, beams, lintels, panels, planks, scaffolding, scaffolding planks, posts, doors, floors, beams made from laminated or cross-laminated timber or wood, lintels made from laminated or cross-laminated timber or wood, panels made from laminated or cross-laminated timber or wood, planks made from laminated or cross-laminated timber or wood, scaffolding made from laminated or cross-laminated timber or wood, scaffolding planks made from laminated or cross-laminated timber or wood, posts made from laminated or cross-laminated timber or wood, doors made from laminated or cross-laminated timber or wood, floorboards, floors made from laminated or cross-laminated timber or wood, wood paneling, wood veneers, wood window frames, wood fences; timber building boards; timber laminates; glue-laminated wood; laminated fibreboard; laminated chipboard; non-metallic laminates for building in the nature of beams made from laminated or cross-laminated timber or wood, lintels made from laminated or cross-laminated timber or wood, panels made from laminated or cross-laminated timber or wood, planks made from laminated or cross-laminated timber or wood, scaffolding made from laminated or cross-laminated timber or wood, scaffolding planks made from laminated or cross-laminated timber or wood, posts made from laminated or cross-laminated timber or wood, doors made from laminated or cross-laminated timber or wood, floors made from laminated or cross-laminated timber or wood; non-metallic composite materials for use in building, namely, wood composite beams, wood composite lintels, wood composite panels, wood composite planks, wood composite scaffolding, wood composite scaffolding planks, wood composite posts, wood composite doors, wood composite floors; non-metallic composite boards for building composed primarily of wood; wood panelling, wood veneers; floorboards; parquetry flooring; wood beams, lintels, panels, planks, scaffolding, scaffolding planks, posts, doors, and floors; semi worked wood; wood window frames; wooden fences, building materials, namely, wooden walls and ceilings; moulded wood, namely, cornices, architectural mouldings and finish trim; hobby wood, namely, balsa wood; floor coverings of wood, namely, wood planks and tiles; flooring made of wood; articles of wood for building purposes, namely, beams, lintels, panels, planks, scaffolding, scaffolding planks, posts, doors, floors, beams made from laminated or cross-laminated timber or wood, lintels made from laminated or cross-laminated timber or wood, panels made from laminated or cross-laminated timber or wood, planks made from laminated or cross-laminated timber or wood, scaffolding made from laminated or cross-laminated timber or wood, scaffolding planks made from laminated or cross-laminated timber or wood, posts made from laminated or cross-laminated timber or wood, doors made from laminated or cross-laminated timber or wood, floors made from laminated or cross-laminated timber or wood
Owner
- Lignor Limited, Melbourne, VIC, AU
- Lignor Limited, Melbourne, VIC, AU
- Lignor Limited, Melbourne, VIC, AU
Prosecution history
- 19 Dec 2023 — NOTICE OF REGISTRATION CONFIRMATION EMAILED
- 19 Dec 2023 — REGISTERED-PRINCIPAL REGISTER
- 03 Oct 2023 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 03 Oct 2023 — PUBLISHED FOR OPPOSITION
- 13 Sept 2023 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
- 29 Aug 2023 — APPROVED FOR PUB - PRINCIPAL REGISTER
- 24 Aug 2023 — NOTIFICATION OF LETTER OF SUSPENSION E-MAILED
- 24 Aug 2023 — LETTER OF SUSPENSION E-MAILED
- 24 Aug 2023 — SUSPENSION LETTER WRITTEN
- 28 Jul 2023 — TEAS/EMAIL CORRESPONDENCE ENTERED
- 28 Jul 2023 — CORRESPONDENCE RECEIVED IN LAW OFFICE
- 28 Jul 2023 — ASSIGNED TO LIE
- 21 Mar 2023 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
- 28 Dec 2022 — NOTIFICATION OF NON-FINAL ACTION E-MAILED
- 28 Dec 2022 — NON-FINAL ACTION E-MAILED