HAPPY YOU'LL BE GUARANTEE
Live / Registered — Registered (as of 16 Jan 2024)
What this means for you
Registered since 16 Jan 2024. The owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 97614951
- Registration number
- 7280921
- Mark type
- Stylized text
- Filed
- 30 Sept 2022
- Published for opposition
- 28 Mar 2023
- Registered
- 16 Jan 2024
- Attorney of record
- Phillip E. Walker
Goods and services
- Class 037 — Building construction and repair services: Plumbing; Drain cleaning services; Drain and sewer cleaning and rootering services; Electrical contracting; Electrical contractor services; Electrical repairs, maintenance, and installation of electrical wiring, outlets, light fixtures, and electrical panels; HVAC contractor services; Plumbing and gas and water installation; Plumbing contractor services; Plumbing services; Septic tank cleaning; Septic tank pumping and cleaning; Comprehensive preventative maintenance service for electrical systems; Contractor services, namely, review of and remedial recommendations for building plumbing, electrical and mechanical systems for others; Installation of electrical wiring; Installation of HVAC systems; Installation of plumbing; Installation of plumbing systems; Installation, maintenance and repair of electrical lighting apparatus; Maintaining septic systems; Maintenance of plumbing; Maintenance of septic systems; Pumping septic tanks; Repair of household appliances and of residential heating, plumbing, air conditioning, and electrical systems
Owner
- Hiller, LLC, Nashville, TN, US
- Hiller, LLC, Nashville, TN, US
- Hiller, LLC, Nashville, TN, US
Prior registrations
Prosecution history
- 22 Jan 2024 — NOTICE OF REGISTRATION CONFIRMATION EMAILED
- 16 Jan 2024 — NOTICE OF REGISTRATION CONFIRMATION EMAILED
- 16 Jan 2024 — NOTICE OF REGISTRATION CONFIRMATION EMAILED
- 16 Jan 2024 — REGISTERED-PRINCIPAL REGISTER
- 12 Dec 2023 — NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED
- 09 Dec 2023 — ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED
- 07 Dec 2023 — STATEMENT OF USE PROCESSING COMPLETE
- 24 Nov 2023 — USE AMENDMENT FILED
- 06 Dec 2023 — CASE ASSIGNED TO INTENT TO USE PARALEGAL
- 24 Nov 2023 — TEAS STATEMENT OF USE RECEIVED
- 23 May 2023 — NOA E-MAILED - SOU REQUIRED FROM APPLICANT
- 28 Mar 2023 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 28 Mar 2023 — PUBLISHED FOR OPPOSITION
- 08 Mar 2023 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
- 14 Feb 2023 — WITHDRAWN FROM PUB - OG REVIEW QUERY