T2 AERFRAME
Live / Registered — Registered (as of 12 Mar 2024)
What this means for you
Registered since 12 Mar 2024. The owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 97600643
- Registration number
- 7325258
- Mark type
- Stylized text
- Filed
- 21 Sept 2022
- Published for opposition
- 26 Dec 2023
- Registered
- 12 Mar 2024
- Attorney of record
- Stephen Jadie Coates
Goods and services
- Class 006 — Metal goods: Common metals and alloys of common metals; reinforcing materials of metal for buildings; pre-fabricated metal building assembly kits; frames of metal for building; beams of metal; non-electric cables and ropes of metal; brackets of metal for building; frameworks of metal for building; insulated metal panels for buildings including semi-permanent or temporary structures; building parts of metal used in tensile structures, namely, posts, beams, roofs, stairs, railings, walls, window frames; metal window shutters in the nature of roller shades of metal; cotters and cotter pins made of metal; pulleys of metal for blinds; bolts of metal; fasteners of metal being security devices for doors and windows; outer doors of metal; insect screens of metal; metal screen doors; tension links of metal; tent poles of metal; tent pegs of metal; metal tent stakes; tensioning wires of metal, tension adjusters and braces of metal for tented structures; cargo slings of metal; awnings of metal; load restraining straps of meta
- Class 022 — Cordage and fibers: Ropes, cords, slings not of metal, for handling loads and bands; tents, awnings of textile or synthetic materials and tarpaulins; canvas and textile bags for the transport and storage of materials; unfitted covers for tents, awnings and tarpaulins; canvas canopies; non-metal fiber, jute, fabric, nylon and vinyl strapping or tie downs; load restraining straps, not of metal; outdoor blinds of textile; ropes for tents; semi-permanent or temporary tented constructions including tents comprised primarily of tensile fabric membranes
Owner
- Tenthouse Structures Pte Ltd, Singapore, SG
- Tenthouse Structures Pte Ltd, Singapore, SG
- Tenthouse Structures Pte Ltd, Singapore, SG
Prosecution history
- 12 Mar 2024 — NOTICE OF REGISTRATION CONFIRMATION EMAILED
- 12 Mar 2024 — REGISTERED-PRINCIPAL REGISTER
- 26 Dec 2023 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 26 Dec 2023 — PUBLISHED FOR OPPOSITION
- 06 Dec 2023 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
- 20 Nov 2023 — APPROVED FOR PUB - PRINCIPAL REGISTER
- 25 Oct 2023 — TEAS/EMAIL CORRESPONDENCE ENTERED
- 24 Oct 2023 — CORRESPONDENCE RECEIVED IN LAW OFFICE
- 24 Oct 2023 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
- 24 Jul 2023 — NOTIFICATION OF NON-FINAL ACTION E-MAILED
- 24 Jul 2023 — NON-FINAL ACTION E-MAILED
- 24 Jul 2023 — NON-FINAL ACTION WRITTEN
- 30 Jun 2023 — ASSIGNED TO EXAMINER
- 06 Oct 2022 — NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
- 24 Sept 2022 — NEW APPLICATION ENTERED