MIM 200 PLUS
Dead / Abandoned — Abandoned — no statement of use filed (as of 25 Aug 2025)
What this means for you
This application is over — abandoned 25 Aug 2025. The name may be available, but check before relying on it — rights can also come from actual use, not only from the register.
Record
- Serial number
- 97566614
- Mark type
- Stylized text
- Filed
- 26 Aug 2022
- Published for opposition
- 29 Nov 2022
- Abandoned
- 25 Aug 2025
- Attorney of record
- Lisel M. Ferguson
Goods and services
- Class 009 — Scientific and electric apparatus: Apparatuses which transform solar and storage systems in buildings into a microgrid, namely, energy efficient apparatus systems comprised of downloadable renewable energy interface software and downloadable buffer and control software for controlling and regulating power and loads, electrical integrated control systems for use in buildings the field of electric microgrid energy, Electrical controllers comprising hardware with embedded software for use in managing a building's power from the Grid, EV Bi-directional chargers, Solar and Energy Storage and to monitor and control the function and status of comprised of the controller, batteries, power conversion systems, power meters, and an energy sources, and building energy control system for balancing energy resources with electrical demand in order to conserve energy comprised of computers, recorded operating software, inverters, electrical switches, switchgear, circuit breakers, and also comprising electricity generators, all for the purposes of generating the highest energy efficiency, isolating electrical power from the Grid, Solar, EV Bi-directional Charger and Energy Storage systems from buildings into a microgrid, and resilient self-consumption of renewable energy and Grid balancing on demand
- Class 040 — Treatment of materials: Production of energy in buildings via renewable resources for use in facilitating the cyber secure and optimal use of solar and storage systems to power all buildings and the power grid, all of the aforementioned for the purposes of isolating electrical power from the Grid, Solar, and Bi-directional chargers into a microgrid; generation of energy for the purposes of isolating electrical power from the Grid, Solar, and Bi-directional chargers into a microgrid, namely, conversion of solar and stored DC power into facility-wide variable frequency AC power for greater electrical appliance and device energy efficiency and run time
Owner
- Neworld.Energy, LLC, Reno, NV, US
- Neworld.Energy, LLC, Reno, NV, US
Prosecution history
- 25 Aug 2025 — ABANDONMENT NOTICE E-MAILED - NO USE STATEMENT FILED
- 25 Aug 2025 — ABANDONMENT - NO USE STATEMENT FILED
- 16 Jul 2025 — TEAS CHANGE OF CORRESPONDENCE RECEIVED
- 16 Jul 2025 — ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED
- 16 Jul 2025 — TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED
- 03 Mar 2025 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 18 Jan 2025 — SOU EXTENSION 4 GRANTED
- 17 Jan 2025 — SOU EXTENSION 4 FILED
- 17 Jan 2025 — SOU TEAS EXTENSION RECEIVED
- 03 Jul 2024 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 02 Jul 2024 — SOU EXTENSION 3 GRANTED
- 02 Jul 2024 — SOU EXTENSION 3 FILED
- 02 Jul 2024 — SOU TEAS EXTENSION RECEIVED
- 26 Jan 2024 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 24 Jan 2024 — SOU EXTENSION 2 GRANTED