WEGOODY
Live / Applied — Suspended — administrative review (as of 16 Dec 2024)
What this means for you
Not registered yet, but its 23 Jul 2022 filing date beats anything filed after it. If it registers, the owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 97517109
- Mark type
- Stylized text
- Filed
- 23 Jul 2022
- Published for opposition
- 20 Jun 2023
Goods and services
- Class 009 — Scientific and electric apparatus: Accumulators and batteries; Alarms for the detection of inflammable gases; Apparatus for converting electronic radiation to electrical energy, namely, photovoltaic roofing members; Battery monitors; Circuit breakers and circuit closers; Circuit overload protector devices; DC/AC power converters; Electrical power distribution units; Photovoltaic installation apparatus, namely, solar modules for production of electricity, solar thermal and electric receivers, tracking mechanisms and concentrating optics, and control algorithms; Photovoltaic inverters; Photovoltaic solar modules for production of electricity; Photovoltaic systems that convert sunlight into electric and thermal energy; Solar panels for production of electricity; Solar wafers; Thin-film solar (TFS), vertical axis wind turbine (VAWT) and Hybrid TFS VAWT off-grid power and deep cycle battery storage systems composed of batteries, charge controllers and inverters with integrated LED bulbs and LED light fixtures
Owner
- Dongguan Saiya Trading Co., Ltd., Guangdong Province, CN
- Dongguan Saiya Trading Co., Ltd., Guangdong Province, CN
Prosecution history
- 18 Dec 2024 — NOTICE OF SUSPENSION EMAILED - ADMIN REVIEW
- 16 Dec 2024 — SUSPENDED PENDING ADMINISTRATIVE REVIEW
- 22 Aug 2024 — REG. CANCELLED - RESTORED TO PENDENCY
- 29 Jul 2024 — ASSIGNED TO PETITION STAFF
- 21 Jun 2024 — REQUEST TO CANCEL INADVERTENTLY ISSUED REGISTRATION RECEIVED
- 02 May 2024 — WITHDRAWAL OF ATTORNEY GRANTED
- 02 May 2024 — TEAS WITHDRAWAL OF ATTORNEY RECEIVED
- 30 Apr 2024 — NOTICE OF REGISTRATION CONFIRMATION EMAILED
- 30 Apr 2024 — REGISTERED-PRINCIPAL REGISTER
- 28 Mar 2024 — NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED
- 27 Mar 2024 — ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED
- 06 Mar 2024 — STATEMENT OF USE PROCESSING COMPLETE
- 14 Feb 2024 — USE AMENDMENT FILED
- 06 Mar 2024 — CASE ASSIGNED TO INTENT TO USE PARALEGAL
- 14 Feb 2024 — TEAS STATEMENT OF USE RECEIVED