B.A.X BUILDING AUTOMATION EXPANDED

Live / Applied — Fourth extension granted (statement of use) (as of 24 Feb 2026)

What this means for you

Not registered yet, but its 13 Jul 2022 filing date beats anything filed after it. If it registers, the owner can stop confusingly similar uses in the classes it covers.

Record

Serial number
97501668
Mark type
Stylized text
Filed
13 Jul 2022
Published for opposition
09 Jan 2024
Attorney of record
Michael Catania

Goods and services

  • Class 009 — Scientific and electric apparatus: downloadable computer software for the on-site and remote monitoring, control, operation, automation, and optimization of, and interaction with, building, facility, and power plant devices, apparatus and systems for heating, air conditioning, ventilation, refrigeration, energy use, allocation, maintenance, efficiency and stabilization; electrical controlling devices; Electric control devices for energy management systems and security systems; Automation process control systems comprising of wireless and wired controllers and downloadable software for automating appliances, lighting, and HVAC ;electronic control devices and automation process control systems comprising wireless and wired controllers, and recorded software for building, facility and power plant environmental, water flow or energy control systems; electronic control devices and automation process control systems comprising of wireless and wired controllers, and recorded software for the on-site and remote monitoring, control, operation, automation, and optimization of, and interaction with, building, facility, and power plant devices, apparatus and systems for heating, air conditioning, ventilation, energy use, water flow, moisture detection, or equipment and systems fault detection; computer hardware, recorded software, electronic sensors, monitors, and electronic controls, for individual and integrated on-site and remote monitoring, control, operation, automation and optimization of, and interaction with, building, facility and power plant devices, apparatus and systems for heating, air conditioning, ventilation, refrigeration, energy use or water flow to be used onsite and in the field; automated process control systems comprised of computer hardware, downloadable software and wireless and wired controllers and controlled devices for gathering, collecting, aggregating, storing, sorting, analyzing and reporting data; automated process control systems comprised of wireless and wired controllers for gathering, collecting, aggregating, storing, analyzing, and reporting data; computer hardware and recorded software for gathering, collecting, aggregating, storing, sorting, analyzing and reporting data from building, facility, and power plant controls for, environmental, water flow, energy, or automation and optimization devices; Electrical controlling systems comprised of recorded software, wireless and wired controllers and controlled devices for gathering, collecting, aggregating, storing, sorting, analyzing and reporting data from building, facility and plant devices, monitors, monitoring systems, sensors, controls, control systems, and apparatus for heating, air conditioning, ventilation, refrigeration, energy use, energy allocation, maintenance, energy efficiency, water flow and moisture detection; computer hardware and recorded software system for wired and wireless networking controls of building, facility and power plant controls of environmental systems

Owner

Prosecution history

  • 25 Feb 2026 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
  • 24 Feb 2026 — SOU EXTENSION 4 GRANTED
  • 24 Feb 2026 — SOU EXTENSION 4 FILED
  • 24 Feb 2026 — SOU TEAS EXTENSION RECEIVED
  • 27 Aug 2025 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
  • 26 Aug 2025 — SOU EXTENSION 3 GRANTED
  • 26 Aug 2025 — SOU EXTENSION 3 FILED
  • 26 Aug 2025 — SOU TEAS EXTENSION RECEIVED
  • 24 Feb 2025 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
  • 24 Feb 2025 — SOU EXTENSION 2 GRANTED
  • 23 Feb 2025 — SOU EXTENSION 2 FILED
  • 23 Feb 2025 — SOU TEAS EXTENSION RECEIVED
  • 26 Aug 2024 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
  • 26 Aug 2024 — SOU EXTENSION 1 GRANTED
  • 26 Aug 2024 — SOU EXTENSION 1 FILED

View this trademark record on Marksy