REEVES
Live / Registered — Registered (as of 23 Apr 2024)
What this means for you
Registered since 23 Apr 2024. The owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 97494336
- Registration number
- 7362962
- Mark type
- Stylized text
- Filed
- 08 Jul 2022
- Published for opposition
- 06 Feb 2024
- Registered
- 23 Apr 2024
- Attorney of record
- John M. Mueller
Goods and services
- Class 001 — Chemicals: Chemical preparations for stabilizing soil and dust for use in construction, repair and maintenance of roads, highways and other traffic ways and surfaces; hydrocarbon-based chemical preparations and emulsifiers for stabilizing soil and dust for use in construction, repair and maintenance of roads, highways and other traffic ways and surfaces
- Class 019 — Non-metallic building materials: Non-metallic bituminous materials, namely, asphalt sealants, bitumen asphalt, cold bituminous mixes in the nature of bitumen-based sealants for roadways, cold asphalt, asphalt and aggregates composed of crushed gravel for making and coating roads as well as other traffic ways and surfaces
- Class 037 — Building construction and repair services: Construction and repair services in the field of roads, highways, and other traffic ways and surfaces utilizing non-metallic building materials for road surface treatment in the nature of chip sealing aggregates, surface dressing made of asphalt and bitumen, asphalt emulsions, wearing course, overlay, floors, asphalt, pitch and bitumen asphalt
Owner
- Reeves Construction Company, Duncan, SC, US
- Reeves Construction Company, Duncan, SC, US
- Reeves Construction Company, Duncan, SC, US
Prosecution history
- 23 Apr 2024 — NOTICE OF REGISTRATION CONFIRMATION EMAILED
- 23 Apr 2024 — REGISTERED-PRINCIPAL REGISTER
- 21 Feb 2024 — POST PUBLICATION AMENDMENT - ENTERED
- 20 Feb 2024 — ASSIGNED TO PETITION STAFF
- 06 Feb 2024 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 06 Feb 2024 — PUBLISHED FOR OPPOSITION
- 19 Jan 2024 — TEAS POST PUBLICATION AMENDMENT RECEIVED
- 17 Jan 2024 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
- 03 Jan 2024 — APPROVED FOR PUB - PRINCIPAL REGISTER
- 20 Dec 2023 — TEAS/EMAIL CORRESPONDENCE ENTERED
- 20 Dec 2023 — CORRESPONDENCE RECEIVED IN LAW OFFICE
- 20 Dec 2023 — TEAS REQUEST FOR RECONSIDERATION RECEIVED
- 09 Nov 2023 — APPLICATION EXTENSION GRANTED/RECEIPT PROVIDED
- 09 Nov 2023 — APPLICATION EXTENSION TO RESPONSE PERIOD - RECEIVED
- 10 Aug 2023 — NOTIFICATION OF FINAL REFUSAL EMAILED