W
Live / Applied — Fourth extension granted (statement of use) (as of 23 Jan 2026)
What this means for you
Not registered yet, but its 06 Jul 2022 filing date beats anything filed after it. If it registers, the owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 97490650
- Mark type
- Word mark
- Filed
- 06 Jul 2022
- Published for opposition
- 28 Nov 2023
- Attorney of record
- George R. Schultz
Goods and services
- Class 017 — Rubber goods: Flexible plastic pipes and plastic couplings, joints and fittings for pipes for municipal, industrial, mining, and irrigation applications, namely for conveying water, wastewater and reclaimed water
- Class 019 — Non-metallic building materials: Non-metal building products, namely, siding, shutters, shingles, shake, moldings, trim, decking, railing for decks, balconies, and exterior staircases for residential and commercial use; non-metal roof products and roofing materials, namely, non-metal roofing tiles, non-metal roofing shingles, non-metal roofing panels and non-metal roofing coverings; non-metal membranes for use in roofing and underground building structures and applications; non-metal windows and window well systems comprised of non-metal window casements and non-metal window jambs; non-metal building materials, namely, stones, bricks, manufactured stone veneer and mounting blocks; plastic or recycled plastic landscape edging; plastic forms for foundation footings and foundation drainage system, namely, non-metal molds and non-metal forming systems comprised of non-metal modular casting forms all for forming cement foundation footings and foundation drainage systems
Owner
- Westlake Corporation, Houston, TX, US
- Westlake Corporation, Houston, TX, US
Prior registrations
Prosecution history
- 24 Jan 2026 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 23 Jan 2026 — SOU EXTENSION 4 GRANTED
- 23 Jan 2026 — SOU EXTENSION 4 FILED
- 23 Jan 2026 — SOU TEAS EXTENSION RECEIVED
- 24 Jul 2025 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 23 Jul 2025 — SOU EXTENSION 3 GRANTED
- 23 Jul 2025 — SOU EXTENSION 3 FILED
- 23 Jul 2025 — SOU TEAS EXTENSION RECEIVED
- 04 Mar 2025 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 24 Jan 2025 — SOU EXTENSION 2 GRANTED
- 23 Jan 2025 — SOU EXTENSION 2 FILED
- 23 Jan 2025 — SOU TEAS EXTENSION RECEIVED
- 24 Jul 2024 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 23 Jul 2024 — SOU EXTENSION 1 GRANTED
- 23 Jul 2024 — SOU EXTENSION 1 FILED