IQ
Live / Registered — Registered (as of 19 Sept 2023)
What this means for you
Registered since 19 Sept 2023. The owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 97479942
- Registration number
- 7171527
- Mark type
- Stylized text
- Filed
- 28 Jun 2022
- Published for opposition
- 23 May 2023
- Registered
- 19 Sept 2023
- Attorney of record
- Charles P. Guarino
Goods and services
- Class 009 — Scientific and electric apparatus: Inverters; electrical load controllers; smart electric control panels; energy storage systems comprised of batteries; batteries for use with renewable energy resources; batteries for storage of renewable energy; photovoltaic electric power generators; solar electric power generators; fuel cell systems; charging stations for electric vehicles; battery and electrical power charging connectors and charging cables; electric control devices for energy management in connection with energy systems; electric control devices for energy management in connection with energy systems; energy management system consisting of electrical outlets, sensors, and electronic display interfaces to measure and regulate energy flow to electric fixtures and other devices in connection with energy systems; instruments for monitoring electrical energy consumption in connection with energy systems; accessories for use connection with energy systems, namely, communications cables, electrical power cables, housings, and relays
Owner
- Enphase Energy, Inc., Fremont, CA, US
- Enphase Energy, Inc., Fremont, CA, US
- Enphase Energy, Inc., Fremont, CA, US
Prior registrations
Prosecution history
- 19 Sept 2023 — NOTICE OF REGISTRATION CONFIRMATION EMAILED
- 19 Sept 2023 — REGISTERED-PRINCIPAL REGISTER
- 18 Aug 2023 — NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED
- 17 Aug 2023 — ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED
- 16 Aug 2023 — STATEMENT OF USE PROCESSING COMPLETE
- 31 Jul 2023 — USE AMENDMENT FILED
- 10 Aug 2023 — CASE ASSIGNED TO INTENT TO USE PARALEGAL
- 31 Jul 2023 — TEAS STATEMENT OF USE RECEIVED
- 18 Jul 2023 — NOA E-MAILED - SOU REQUIRED FROM APPLICANT
- 23 May 2023 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 23 May 2023 — PUBLISHED FOR OPPOSITION
- 03 May 2023 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
- 18 Apr 2023 — APPROVED FOR PUB - PRINCIPAL REGISTER
- 11 Apr 2023 — ASSIGNED TO EXAMINER
- 18 Jul 2022 — NEW APPLICATION OFFICE SUPPLIED DATA ENTERED