ABF AMERICAN BATTERY FACTORY
Live / Applied — Fourth extension granted (statement of use) (as of 12 Nov 2025)
What this means for you
Not registered yet, but its 23 May 2022 filing date beats anything filed after it. If it registers, the owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 97424547
- Mark type
- Design + words
- Filed
- 23 May 2022
- Published for opposition
- 12 Sept 2023
- Attorney of record
- Terrence J. Edwards
Goods and services
- Class 037 — Building construction and repair services: Installation and maintenance of fuel cells; Installation and maintenance of lithium iron phosphate, lithium ion, and sodium fuel cells; Installing, servicing, and repairing of fuel cell systems and generators; Building of systems for the generation of fuel cells; Building of systems for the generation of lithium iron phosphate, lithium ion, and sodium fuel cells; Commissioning and providing systems for the generation of energy, namely, construction of energy generating installations
Owner
- American Battery Factory Inc., American Fork, UT, US
- American Battery Factory Inc., Orem, UT, US
Prosecution history
- 12 Nov 2025 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 12 Nov 2025 — SOU EXTENSION 4 GRANTED
- 07 Nov 2025 — SOU EXTENSION 4 FILED
- 07 Nov 2025 — SOU TEAS EXTENSION RECEIVED
- 01 May 2025 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 01 May 2025 — SOU EXTENSION 3 GRANTED
- 30 Apr 2025 — SOU EXTENSION 3 FILED
- 30 Apr 2025 — SOU TEAS EXTENSION RECEIVED
- 26 Nov 2024 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 26 Nov 2024 — SOU EXTENSION 2 GRANTED
- 06 Nov 2024 — SOU EXTENSION 2 FILED
- 26 Nov 2024 — CASE ASSIGNED TO INTENT TO USE PARALEGAL
- 06 Nov 2024 — SOU TEAS EXTENSION RECEIVED
- 08 May 2024 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 07 May 2024 — SOU EXTENSION 1 GRANTED