FANWAYER
Dead / Abandoned — Abandoned — failure to respond (as of 20 Oct 2023)
What this means for you
This application is over — abandoned 10 Oct 2023. The name may be available, but check before relying on it — rights can also come from actual use, not only from the register.
Record
- Serial number
- 97408103
- Mark type
- Stylized text
- Filed
- 12 May 2022
- Abandoned
- 10 Oct 2023
- Attorney of record
- Stevenson Moore V
Goods and services
- Class 007 — Machines and machine tools: Hydraulic pumps and motors for hydrostatic systems, comprised of pumps, motors, valves, switches, sensors and electronic controls, for hydraulic drives and force transmission in machines, machine tools, grinding and food processing machines and in off-road-vehicles; Parts for compressed-air machines, namely, pressure switches and sensors for monitoring, controlling, and switching hydraulic or pneumatic systems sold as an integral component of injection molding machines; Parts for compressed-air tools, namely, brakes, filters, hoses, pipes, couplings valves, switches, compressors, clamping tools and injectors; Pressure switches as parts of machines; Pressure transducers and transmitters that convert hydraulic or pneumatic pressure into analog electrical signals for monitoring and controlling hydraulic or pneumatic systems sold as a unit with manufacturing machines
Owner
- FAN WAYER INDUSTRIAL CO.,LIMITED, CHANGZHOU,JIANGSU, CN
Prosecution history
- 20 Oct 2023 — ABANDONMENT NOTICE E-MAILED - FAILURE TO RESPOND
- 20 Oct 2023 — ABANDONMENT NOTICE MAILED - FAILURE TO RESPOND
- 20 Oct 2023 — ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSE
- 06 Jul 2023 — NOTIFICATION OF FINAL REFUSAL EMAILED
- 06 Jul 2023 — FINAL REFUSAL E-MAILED
- 06 Jul 2023 — FINAL REFUSAL WRITTEN
- 31 May 2023 — TEAS/EMAIL CORRESPONDENCE ENTERED
- 30 May 2023 — CORRESPONDENCE RECEIVED IN LAW OFFICE
- 30 May 2023 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
- 08 Mar 2023 — NOTIFICATION OF NON-FINAL ACTION E-MAILED
- 08 Mar 2023 — NON-FINAL ACTION E-MAILED
- 08 Mar 2023 — NON-FINAL ACTION WRITTEN
- 01 Mar 2023 — ASSIGNED TO EXAMINER
- 17 May 2022 — NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
- 16 May 2022 — NEW APPLICATION ENTERED