TRUEMONT MATERIALS
Live / Registered — Registered (as of 13 Aug 2024)
What this means for you
Registered since 13 Aug 2024. The owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 97369819
- Registration number
- 7475807
- Mark type
- Stylized text
- Filed
- 19 Apr 2022
- Published for opposition
- 14 Mar 2023
- Registered
- 13 Aug 2024
- Attorney of record
- Aaron J. Wong
Goods and services
- Class 019 — Non-metallic building materials: Artificial stone; Pavers; Concrete retaining walls; Stepping and footing stones of concrete or wood for use in lawns and pathways; Non-metal casting forms for concrete; Concrete blocks; Concrete footings; Paving stones; Wall stone; Synthetic rocks for creating landscape and waterscape settings; Non-metal seawalls; non-metal construction precast foundations for site lighting
- Class 037 — Building construction and repair services: Hardscaping services; installation of pavers, fire pits, and fireplaces; hardscape services, namely, construction and installation of paved areas in the nature of patios, driveways, walls, retaining walls, sleeper walls, stairs, walkways, and pathways
- Class 042 — Scientific and technological services: Lighting design and technology specification services pertaining to permanent or temporary architectural, theatrical, entertainment, commercial and/or residential applications; Consulting services in the field of retaining wall design and architecture; Consultancy in the field of hardscape architecture; Hardscape design
Owner
- Redi-Rock International, L.L.C., Petoskey, MI, US
- Redi-Rock International, L.L.C., Petoskey, MI, US
- Redi-Rock International, L.L.C., Petoskey, MI, US
Prosecution history
- 13 Aug 2024 — NOTICE OF REGISTRATION CONFIRMATION EMAILED
- 13 Aug 2024 — REGISTERED-PRINCIPAL REGISTER
- 08 Jul 2024 — NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED
- 08 Jul 2024 — ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED
- 10 Jun 2024 — STATEMENT OF USE PROCESSING COMPLETE
- 06 May 2024 — USE AMENDMENT FILED
- 10 Jun 2024 — CASE ASSIGNED TO INTENT TO USE PARALEGAL
- 06 May 2024 — TEAS STATEMENT OF USE RECEIVED
- 11 Nov 2023 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 09 Nov 2023 — SOU EXTENSION 1 GRANTED
- 09 Nov 2023 — SOU EXTENSION 1 FILED
- 09 Nov 2023 — SOU TEAS EXTENSION RECEIVED
- 09 May 2023 — NOA E-MAILED - SOU REQUIRED FROM APPLICANT
- 14 Mar 2023 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 14 Mar 2023 — PUBLISHED FOR OPPOSITION