ANACONDA POWER SYSTEM
Live / Applied — Statement of use — non-final action mailed (as of 09 Feb 2026)
What this means for you
Not registered yet, but its 13 Apr 2022 filing date beats anything filed after it. If it registers, the owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 97361725
- Mark type
- Stylized text
- Filed
- 13 Apr 2022
- Published for opposition
- 07 Feb 2023
- Attorney of record
- Martin M. Zoltick
Goods and services
- Class 009 — Scientific and electric apparatus: Electric wires and cables
- Class 037 — Building construction and repair services: Assembly services relating to the installation of wiring harnesses, electrical distribution systems, electrical connection boxes, namely, control box assemblies, electronic controller panels, instrument panels, and other critical engineered components used for diverse industries
- Class 040 — Treatment of materials: Manufacture of wiring harnesses, electrical distribution systems, electrical connection boxes, namely, control box assemblies, electronic controller panels, instrument panels, and other critical engineered components for others used in diverse industries
- Class 042 — Scientific and technological services: Custom design of wiring harnesses, electrical distribution systems, electrical connection boxes, namely, control box assemblies, electronic controller panels, instrument panels, and other critical engineered components used for diverse industries; engineering services, namely, engineering for the electric industry
Owner
- Electrical Components International, Inc., St. Louis, MO, US
- Electrical Components International, Inc., St. Louis, MO, US
Prosecution history
- 09 Feb 2026 — NOTIFICATION OF NON-FINAL ACTION E-MAILED
- 09 Feb 2026 — NON-FINAL ACTION E-MAILED
- 09 Feb 2026 — SU - NON-FINAL ACTION - WRITTEN
- 18 Jan 2026 — STATEMENT OF USE PROCESSING COMPLETE
- 14 Jul 2025 — USE AMENDMENT FILED
- 18 Jan 2026 — CASE ASSIGNED TO INTENT TO USE PARALEGAL
- 14 Jul 2025 — TEAS STATEMENT OF USE RECEIVED
- 04 Apr 2025 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 03 Apr 2025 — SOU EXTENSION 4 GRANTED
- 03 Apr 2025 — SOU EXTENSION 4 FILED
- 03 Apr 2025 — SOU TEAS EXTENSION RECEIVED
- 27 Sept 2024 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 27 Sept 2024 — SOU EXTENSION 3 GRANTED
- 27 Sept 2024 — SOU EXTENSION 3 FILED
- 27 Sept 2024 — SOU TEAS EXTENSION RECEIVED