SCUBA BRIDGE
Live / Applied — Fifth extension granted (statement of use) (as of 07 Feb 2026)
What this means for you
Not registered yet, but its 29 Mar 2022 filing date beats anything filed after it. If it registers, the owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 97336484
- Mark type
- Stylized text
- Filed
- 29 Mar 2022
- Published for opposition
- 21 Feb 2023
- Attorney of record
- Syed Abedi
Goods and services
- Class 006 — Metal goods: Prefabricated metal bridges and prefabricated structural parts for metal bridges; prefabricated metal submersible bridges and prefabricated structural parts for metal submersible bridges; prefabricated metal movable bridges and prefabricated structural parts for metal movable bridges; prefabricated metal low-water bridges and prefabricated structural parts for metal low-water bridges
Owner
- Everett Engineering, Inc., Everett, WA, US
- Everett Engineering, Inc., Everett, WA, US
Prosecution history
- 07 Feb 2026 — SOU EXTENSION 5 GRANTED
- 15 Sept 2025 — SOU EXTENSION 5 FILED
- 30 Jan 2026 — CASE ASSIGNED TO INTENT TO USE PARALEGAL
- 15 Sept 2025 — SOU TEAS EXTENSION RECEIVED
- 17 Mar 2025 — TEAS WITHDRAWAL OF ATTORNEY RECEIVED-FIRM RETAINS
- 17 Mar 2025 — TEAS CHANGE OF CORRESPONDENCE RECEIVED
- 17 Mar 2025 — ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED
- 17 Mar 2025 — TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED
- 22 Feb 2025 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 21 Feb 2025 — SOU EXTENSION 4 GRANTED
- 21 Feb 2025 — SOU EXTENSION 4 FILED
- 21 Feb 2025 — SOU TEAS EXTENSION RECEIVED
- 04 Sept 2024 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 04 Sept 2024 — SOU EXTENSION 3 GRANTED
- 04 Sept 2024 — SOU EXTENSION 3 FILED