T

Live / Applied — Fourth extension granted (statement of use) (as of 29 Oct 2025)

What this means for you

Not registered yet, but its 22 Feb 2022 filing date beats anything filed after it. If it registers, the owner can stop confusingly similar uses in the classes it covers.

Record

Serial number
97278424
Mark type
Word mark
Filed
22 Feb 2022
Published for opposition
29 Aug 2023
Attorney of record
Clifton E. McCann

Goods and services

  • Class 007 — Machines and machine tools: Loading and unloading machines and apparatus, namely, conveyor machines, power jacks, conveyors, and parts for all of the foregoing; rubber tracks that are designed for use on loading and unloading machines and structural and replacement parts for the rubber tracks; hydraulic lift tables; elevating work platforms and parts therefor; crane augers and parts therefor; lifting and hoisting machines, namely, elevators, elevating work platforms, hoists, belt conveyors, fork lifts and lifting work platforms, and parts for all of the foregoing; aerial elevating work platforms and parts therefor; aerial elevating work platforms for attachment to cranes and hoists and parts therefor; rail and rail car mounted loading and unloading devices, namely, rail and rail car mounted cranes and hoists and parts for all of the foregoing
  • Class 012 — Vehicles: Lift operating apparatus in the nature of vehicles, namely, fork lift trucks and structural and replacement parts therefor; camera drones, other than toys, and structural and replacement parts therefor; civilian drones and structural and replacement parts therefor
  • Class 037 — Building construction and repair services: Repair and maintenance of mining machines and apparatus; repair and maintenance of railway equipment and apparatus; providing information on repair and maintenance of mining machines and their parts and apparatus; provision of information in the nature of the location and operational status for repair and maintenance of mining machines and apparatus

Owner

Prosecution history

  • 29 Oct 2025 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
  • 29 Oct 2025 — SOU EXTENSION 4 GRANTED
  • 23 Oct 2025 — SOU EXTENSION 4 FILED
  • 24 Oct 2025 — SOU TEAS EXTENSION RECEIVED
  • 02 May 2025 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
  • 01 May 2025 — SOU EXTENSION 3 GRANTED
  • 23 Apr 2025 — SOU EXTENSION 3 FILED
  • 23 Apr 2025 — SOU TEAS EXTENSION RECEIVED
  • 24 Oct 2024 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
  • 24 Oct 2024 — SOU EXTENSION 2 GRANTED
  • 24 Oct 2024 — SOU EXTENSION 2 FILED
  • 24 Oct 2024 — SOU TEAS EXTENSION RECEIVED
  • 29 Aug 2024 — CORRECTED NOA E-MAILED
  • 19 Aug 2024 — DIVISIONAL PROCESSING COMPLETE
  • 24 Apr 2024 — DIVISIONAL REQUEST RECEIVED

View this trademark record on Marksy