Serial 97241016
Live / Registered — Registered (as of 03 Sept 2024)
What this means for you
Registered since 03 Sept 2024. The owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 97241016
- Registration number
- 7496042
- Mark type
- Design / logo
- Filed
- 27 Jan 2022
- Published for opposition
- 27 Jun 2023
- Registered
- 03 Sept 2024
- Attorney of record
- Tricia L. Schulz
Goods and services
- Class 009 — Scientific and electric apparatus: Fuel cells; energy generators, namely, fuel cells; electrochemical devices, namely, fuel cells; electrochemical devices configured for energy storage, namely, electrolysers; fuel cells configured for energy storage
- Class 011 — Environmental control apparatus: Fuel cell power plants; fuel cell power plants configured for recouping energy in pipeline applications, namely, natural gas pipelines; fuel cell power plants configured for capturing carbon emissions; fuel cell power plants configured for hydrogen production; fuel cell power plants configured for hydrogen separation; fuel cell power plants configured for energy storage
- Class 037 — Building construction and repair services: Installation of fuel cell power plants; maintenance of fuel cell power plants; providing field services for fuel cell power plant operation, namely, maintenance and repair; custom construction of fuel cell power plants for others; construction of fuel cell power plants to order for others; and construction of fuel cell power plant installations
Owner
- FuelCell Energy, Inc., Danbury, CT, US
- FuelCell Energy, Inc., Danbury, CT, US
- FuelCell Energy, Inc., Danbury, CT, US
Prosecution history
- 03 Sept 2024 — NOTICE OF REGISTRATION CONFIRMATION EMAILED
- 03 Sept 2024 — REGISTERED-PRINCIPAL REGISTER
- 11 Apr 2024 — NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED
- 10 Apr 2024 — ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED
- 15 Mar 2024 — STATEMENT OF USE PROCESSING COMPLETE
- 22 Feb 2024 — USE AMENDMENT FILED
- 15 Mar 2024 — CASE ASSIGNED TO INTENT TO USE PARALEGAL
- 22 Feb 2024 — TEAS STATEMENT OF USE RECEIVED
- 23 Feb 2024 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 22 Feb 2024 — SOU EXTENSION 1 GRANTED
- 22 Feb 2024 — SOU EXTENSION 1 FILED
- 22 Feb 2024 — SOU TEAS EXTENSION RECEIVED
- 22 Aug 2023 — NOA E-MAILED - SOU REQUIRED FROM APPLICANT
- 27 Jun 2023 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 27 Jun 2023 — PUBLISHED FOR OPPOSITION