FUELCELL ENERGY
Live / Applied — Third extension granted (statement of use) (as of 06 Oct 2025)
What this means for you
Not registered yet, but its 27 Jan 2022 filing date beats anything filed after it. If it registers, the owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 97241011
- Mark type
- Design + words
- Filed
- 27 Jan 2022
- Published for opposition
- 20 Feb 2024
- Attorney of record
- Tricia L. Schulz
Goods and services
- Class 009 — Scientific and electric apparatus: Fuel cells; energy generators, namely, fuel cells; electrochemical devices, namely, fuel cells; electrochemical devices configured for energy storage, namely, electrolysers; fuel cells configured for energy storage
- Class 011 — Environmental control apparatus: Fuel cell power plants; fuel cell power plants configured for recouping energy in pipeline applications, namely, natural gas pipelines; fuel cell power plants configured for capturing carbon emissions; fuel cell power plants configured for hydrogen production; fuel cell power plants configured for hydrogen separation; fuel cell power plants configured for energy storage
- Class 037 — Building construction and repair services: Installation of fuel cell power plants; maintenance of fuel cell power plants; providing field services for fuel cell power plant operation, namely, maintenance and repair; custom construction of fuel cell power plants for others; construction of fuel cell power plants to order for others; and construction of fuel cell power plant installations
Owner
- FuelCell Energy, Inc., Danbury, CT, US
- FuelCell Energy, Inc., Danbury, CT, US
Prior registrations
Prosecution history
- 02 Apr 2026 — CASE ASSIGNED TO INTENT TO USE PARALEGAL
- 07 Oct 2025 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 06 Oct 2025 — TEAS STATEMENT OF USE RECEIVED
- 06 Oct 2025 — SOU EXTENSION 3 GRANTED
- 06 Oct 2025 — SOU EXTENSION 3 FILED
- 06 Oct 2025 — SOU TEAS EXTENSION RECEIVED
- 16 Apr 2025 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 15 Apr 2025 — SOU EXTENSION 2 GRANTED
- 15 Apr 2025 — SOU EXTENSION 2 FILED
- 15 Apr 2025 — SOU TEAS EXTENSION RECEIVED
- 10 Oct 2024 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 10 Oct 2024 — SOU EXTENSION 1 GRANTED
- 10 Oct 2024 — SOU EXTENSION 1 FILED
- 10 Oct 2024 — SOU TEAS EXTENSION RECEIVED
- 16 Apr 2024 — NOA E-MAILED - SOU REQUIRED FROM APPLICANT