GRIPTERRA
Live / Registered — Registered (as of 16 Apr 2024)
What this means for you
Registered since 16 Apr 2024. The owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 97235215
- Registration number
- 7361071
- Mark type
- Stylized text
- Filed
- 24 Jan 2022
- Published for opposition
- 25 Jul 2023
- Registered
- 16 Apr 2024
- Attorney of record
- John M. Kim
Goods and services
- Class 037 — Building construction and repair services: Construction-consultation services; Construction-management and post-construction-monitoring services; Technical consultation in the field of construction
- Class 042 — Scientific and technological services: Engineering services and technical consultation in the fields of industrial engineering, civil engineering, geotechnical engineering, and wind turbine foundations; Design, research, development, and testing services and technical consultation in the field of engineering; Providing on-line, non-downloadable software for use in database management for test results, surveys, inspections, specifications, and other information in the fields of engineering and construction; Technical-support services, namely, using software to provide real time data collection and analytics for reporting on foundation performance in the fields of engineering and construction; Scientific and technological services, namely, scientific research, analysis, and testing in the fields of engineering and construction
Owner
- Terracon Consultants, Inc., Olathe, KS, US
- Terracon Consultants, Inc., Olathe, KS, US
- Terracon Consultants, Inc., Olathe, KS, US
Prosecution history
- 16 Apr 2024 — NOTICE OF REGISTRATION CONFIRMATION EMAILED
- 16 Apr 2024 — REGISTERED-PRINCIPAL REGISTER
- 12 Mar 2024 — NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED
- 11 Mar 2024 — ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED
- 16 Feb 2024 — STATEMENT OF USE PROCESSING COMPLETE
- 24 Jan 2024 — USE AMENDMENT FILED
- 16 Feb 2024 — CASE ASSIGNED TO INTENT TO USE PARALEGAL
- 24 Jan 2024 — TEAS STATEMENT OF USE RECEIVED
- 19 Sept 2023 — NOA E-MAILED - SOU REQUIRED FROM APPLICANT
- 25 Jul 2023 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 25 Jul 2023 — PUBLISHED FOR OPPOSITION
- 05 Jul 2023 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
- 22 Jun 2023 — APPROVED FOR PUB - PRINCIPAL REGISTER
- 22 Jun 2023 — EXAMINER'S AMENDMENT ENTERED
- 22 Jun 2023 — NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED