MAGNETERGY
Live / Applied — Fourth extension granted (statement of use) (as of 06 Jan 2026)
What this means for you
Not registered yet, but its 04 Jan 2022 filing date beats anything filed after it. If it registers, the owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 97202113
- Mark type
- Stylized text
- Filed
- 04 Jan 2022
- Published for opposition
- 14 Nov 2023
- Attorney of record
- Gerald L. DePardo
Goods and services
- Class 007 — Machines and machine tools: Magnetic and magnetic-based devices, apparatuses, components and modules, namely, magnetic shaft couplings for machines, for improving the efficiency and performance of generators, alternators, engines, electric motors, transportation vehicles, vehicles for transportation over land and air and water and space, wind turbines, rotating machinery, rotating equipment, compressors, chillers, turbines, pumps, fans, blowers, gearboxes, motorcycles, electric motorcycles, bicycles, e-bikes, skateboards, e-skateboards, scooters, e-scooters, planes, jets, boats, power boats, space craft, space station, elevators, escalators, sawmills, planers, power washers, leaf blowers, tractors, motorized crop machines, milking machines, sewing machines, washing machines, air dryers, blow dryers, lathes, drills, rotating saws, chain saws, circular saws, drill presses, grinders, sanders, air scavengers, electric vehicles, and battery chargers; Wind turbines; Electric generators; Generators for wind turbines
Owner
- GREEN WAVE POWER SYSTEMS LLC, Haddam, CT, US
- GREEN WAVE POWER SYSTEMS LLC, Haddam, CT, US
Prosecution history
- 06 Jan 2026 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 06 Jan 2026 — SOU EXTENSION 4 GRANTED
- 05 Jan 2026 — SOU EXTENSION 4 FILED
- 05 Jan 2026 — SOU TEAS EXTENSION RECEIVED
- 09 Jul 2025 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 08 Jul 2025 — SOU EXTENSION 3 GRANTED
- 08 Jul 2025 — SOU EXTENSION 3 FILED
- 08 Jul 2025 — SOU TEAS EXTENSION RECEIVED
- 09 Jan 2025 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 09 Jan 2025 — SOU EXTENSION 2 GRANTED
- 09 Jan 2025 — SOU EXTENSION 2 FILED
- 09 Jan 2025 — SOU TEAS EXTENSION RECEIVED
- 09 Jul 2024 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 09 Jul 2024 — SOU EXTENSION 1 GRANTED
- 09 Jul 2024 — SOU EXTENSION 1 FILED