SYZYGY PLASMONICS
Dead / Abandoned — Abandoned — no statement of use filed (as of 11 Aug 2025)
What this means for you
This application is over — abandoned 11 Aug 2025. The name may be available, but check before relying on it — rights can also come from actual use, not only from the register.
Record
- Serial number
- 97196235
- Mark type
- Design + words
- Filed
- 29 Dec 2021
- Published for opposition
- 16 May 2023
- Abandoned
- 11 Aug 2025
- Attorney of record
- Kirsten L. Thomson
Goods and services
- Class 001 — Chemicals: Photocatalysts; commodity chemicals, namely, hydrogen, refined methanol for industrial purposes, ammonia for industrial purposes, ethylene, aromatic hydrocarbons, organic compounds, namely, butadiene for the manufacture of synthetic rubber, synthesis gas for use in production processes, in particular in processes for producing hydrogen, ammonia, motor fuels and methanol
- Class 004 — Lubricants and fuels: Synfuels, namely, fuel made from natural gas, low-carbon fuels, namely methanol and ethanol, jet fuel, aviation fuel, sustainable aviation fuel (SAF), and kerosene
- Class 011 — Environmental control apparatus: Chemical manufacturing equipment and components, namely, steam reformers; photocatalytic reactors; photocatalytic cells
- Class 035 — Advertising and business services: Consultation in the field of energy efficiency
- Class 040 — Treatment of materials: Energy recycling services, namely, capturing and conversion of wasted energy into electricity and useful steam; consultation in the field of photocatalytic chemical manufacturing process
- Class 042 — Scientific and technological services: Engineering and consulting services in the field of photocatalysis for industrial chemical manufacturing
Owner
- Syzygy Plasmonics Inc., Houston, TX, US
- Syzygy Plasmonics Inc., Houston, TX, US
Prosecution history
- 11 Aug 2025 — ABANDONMENT NOTICE E-MAILED - NO USE STATEMENT FILED
- 11 Aug 2025 — ABANDONMENT - NO USE STATEMENT FILED
- 03 Mar 2025 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 11 Jan 2025 — SOU EXTENSION 3 GRANTED
- 10 Jan 2025 — SOU EXTENSION 3 FILED
- 10 Jan 2025 — SOU TEAS EXTENSION RECEIVED
- 09 Jul 2024 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 09 Jul 2024 — SOU EXTENSION 2 GRANTED
- 09 Jul 2024 — SOU EXTENSION 2 FILED
- 09 Jul 2024 — SOU TEAS EXTENSION RECEIVED
- 09 Jan 2024 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 05 Jan 2024 — SOU EXTENSION 1 GRANTED
- 05 Jan 2024 — SOU EXTENSION 1 FILED
- 05 Jan 2024 — SOU TEAS EXTENSION RECEIVED
- 11 Jul 2023 — NOA E-MAILED - SOU REQUIRED FROM APPLICANT