DOCTORSAND
Live / Registered — Registered (as of 22 Oct 2024)
What this means for you
Registered since 22 Oct 2024. The owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 97193521
- Registration number
- 7545230
- Mark type
- Stylized text
- Filed
- 28 Dec 2021
- Published for opposition
- 02 May 2023
- Registered
- 22 Oct 2024
- Attorney of record
- Michelle P. Ciotola
Goods and services
- Class 019 — Non-metallic building materials: [Asphalt; Pitch and Bitumen; Non-Metallic Transportable Buildings;] Plaster and Gravel; [Modified Plaster for building purposes; Coat Plaster for building purposes; Concrete;] Concrete Building Materials, namely, sand made from concrete used for ready mix concrete Elements; [Refractory and Insulating Concrete for energy conserving building purposes; Building Plaster for building purposes; Crack Repair materials, namely, Mortar patching compound; Crack Repair materials, namely, Concrete patching compound; Micro Concrete for building purposes; Self Leveling Mortar for building purposes; Self Leveling Concrete for use in building construction; Integral Waterproofed Concrete for use in building construction;] Building Stone; Sand; Sandstone for Building; Granite Sand, namely, sand made from crushed ground granite; Mortar and Plaster Sand, namely, sand used for making mortar and plaster; [Cement; Hydraulic Cement; Cement Based Wall Texture Composition for building purposes; Refractory and Insulating Cement for energy conserving building purposes; Cement Boards, namely, cement bonded particle board]
Owner
- CDE ASIA LIMITED, Kolkata, West Bengal, IN
- CDE ASIA LIMITED, Kolkata, West Bengal, IN
- CDE ASIA LIMITED, Kolkata, West Bengal, IN
Prosecution history
- 22 Jul 2025 — CORRECTION UNDER SECTION 7 - PROCESSED
- 29 Apr 2025 — NOTICE OF UPDATED REGISTRATION CONFIRMATION EMAILED
- 27 Mar 2025 — ON HOLD - ELECTRONIC RECORD REVIEW REQUIRED
- 27 Mar 2025 — CORRECTION UNDER SECTION 7 - PROCESSED
- 25 Mar 2025 — CASE ASSIGNED TO POST REGISTRATION PARALEGAL
- 29 Oct 2024 — TEAS SECTION 7 REQUEST RECEIVED
- 22 Oct 2024 — NOTICE OF REGISTRATION CONFIRMATION EMAILED
- 22 Oct 2024 — REGISTERED-PRINCIPAL REGISTER
- 18 Sept 2024 — NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED
- 18 Sept 2024 — ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED
- 21 Aug 2024 — STATEMENT OF USE PROCESSING COMPLETE
- 26 Jun 2024 — USE AMENDMENT FILED
- 21 Aug 2024 — CASE ASSIGNED TO INTENT TO USE PARALEGAL
- 26 Jun 2024 — TEAS STATEMENT OF USE RECEIVED
- 29 Dec 2023 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED