GREEN LEAF CARBON TECHNOLOGIES

Live / Applied — Fifth extension granted (statement of use) (as of 16 Mar 2026)

What this means for you

Not registered yet, but its 08 Dec 2021 filing date beats anything filed after it. If it registers, the owner can stop confusingly similar uses in the classes it covers.

Record

Serial number
97162004
Mark type
Stylized text
Filed
08 Dec 2021
Published for opposition
02 May 2023
Attorney of record
Erik S. Ericksen

Goods and services

  • Class 037 — Building construction and repair services: Mining extraction services for the recovery of oil and related products from hydrocarbon deposits, namely, oil shale, tar sands, coal, peat, plastics, and biomass; Land reclamation; Mining extraction for the production of crude oil, kerogen hydrocarbon residues, plastics, and biomass; Mining extraction for the production of crude oil, kerogen and hydrocarbon residues
  • Class 039 — Transportation and storage services: Carbon sequestration services using technologies to sequester carbon produced from oil shale projects, namely, transmission of captured carbon dioxide by means of trucking and pipeline for others; Carbon sequestration services using technologies to sequester carbon produced from oil shale projects, namely, physical storage of captured carbon dioxide for others
  • Class 040 — Treatment of materials: Carbon sequestration services using technologies to sequester carbon produced from oil shale projects, namely, carbon capture for others using in-ground sequestration and sequestration in spent shale
  • Class 042 — Scientific and technological services: Engineering, namely, mining engineering using clean technology to produce oil from oil shale and CO2 produced from oil production sequestered with enhanced oil recovery (EOR) in nearby conventional oil fields; Engineering, namely, mining engineering services for simultaneous recovery of rare earth elements from oil shale projects

Owner

Prosecution history

  • 16 Mar 2026 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
  • 16 Mar 2026 — SOU EXTENSION 5 GRANTED
  • 14 Oct 2025 — SOU EXTENSION 5 FILED
  • 13 Mar 2026 — CASE ASSIGNED TO INTENT TO USE PARALEGAL
  • 15 Oct 2025 — SOU TEAS EXTENSION RECEIVED
  • 11 Apr 2025 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
  • 11 Apr 2025 — SOU EXTENSION 4 GRANTED
  • 10 Apr 2025 — SOU EXTENSION 4 FILED
  • 10 Apr 2025 — SOU TEAS EXTENSION RECEIVED
  • 03 Mar 2025 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
  • 03 Dec 2024 — SOU EXTENSION 3 GRANTED
  • 03 Dec 2024 — SOU EXTENSION 3 FILED
  • 03 Dec 2024 — SOU TEAS EXTENSION RECEIVED
  • 11 Jun 2024 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
  • 11 Jun 2024 — SOU EXTENSION 2 GRANTED

View this trademark record on Marksy