R RENON RENON POWER
Live / Registered — Registered (as of 13 Dec 2022)
What this means for you
Registered since 13 Dec 2022. The owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 97094494
- Registration number
- 6922000
- Mark type
- Design + words
- Filed
- 27 Oct 2021
- Published for opposition
- 27 Sept 2022
- Registered
- 13 Dec 2022
Goods and services
- Class 009 — Scientific and electric apparatus: Inverters; Accumulators, electric, for vehicles; Batteries, electric; Batteries, electric, for vehicles; Battery packs; Car batteries; Chargers for batteries; Electric batteries; Electric batteries for powering electric vehicles; High tension batteries; Lithium ion batteries; Lithium iron phosphate batteries; Off-grid power and deep cycle battery storage systems comprised of batteries, charge controllers and inverters with integrated LED bulbs and LED light fixtures for solar, thin-film solar (TFS), vertical axis wind turbine (VAWT) installations; Rechargeable batteries; Renewable battery system to provide backup power; Solar batteries; Thin-film solar (TFS), vertical axis wind turbine (VAWT) and Hybrid TFS VAWT off-grid power and deep cycle battery storage systems composed of batteries, charge controllers and inverters with integrated LED bulbs and LED light fixtures
Owner
- RENON POWER TECHNOLOGY INC., AUSTIN, TX, US
- RENON TECHNOLOGY (SHENZHEN) CO.,LTD, SHENZHEN, CN
- RENON TECHNOLOGY (SHENZHEN) CO.,LTD, SHENZHEN, CN
- RENON TECHNOLOGY (SHENZHEN) CO.,LTD, SHENZHEN, CN
- Zhongrui Green Energy Technology (shenzhen) Co. LTD, Longgang Dist,Shenzhen, CN
Prosecution history
- 07 Jan 2025 — AMENDMENT CORRESPONDENCE ENTERED
- 27 Mar 2024 — AUTOMATIC UPDATE OF ASSIGNMENT OF OWNERSHIP
- 13 Dec 2022 — NOTICE OF REGISTRATION CONFIRMATION EMAILED
- 13 Dec 2022 — REGISTERED-PRINCIPAL REGISTER
- 27 Sept 2022 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 27 Sept 2022 — PUBLISHED FOR OPPOSITION
- 07 Sept 2022 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
- 18 Aug 2022 — APPROVED FOR PUB - PRINCIPAL REGISTER
- 17 Aug 2022 — TEAS/EMAIL CORRESPONDENCE ENTERED
- 16 Aug 2022 — CORRESPONDENCE RECEIVED IN LAW OFFICE
- 16 Aug 2022 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
- 08 Aug 2022 — NOTIFICATION OF NON-FINAL ACTION E-MAILED
- 08 Aug 2022 — NON-FINAL ACTION E-MAILED
- 08 Aug 2022 — NON-FINAL ACTION WRITTEN
- 05 Aug 2022 — ASSIGNED TO EXAMINER