QATARENERGY
Live / Applied — Statement of use — registration review complete (as of 09 Sept 2026)
What this means for you
Not registered yet, but its 18 Oct 2021 filing date beats anything filed after it. If it registers, the owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 97078709
- Mark type
- Design + words
- Filed
- 18 Oct 2021
- Published for opposition
- 20 Jun 2023
- Attorney of record
- Anna Kurian Shaw
Goods and services
- Class 004 — Lubricants and fuels: Fuels; natural gas
- Class 037 — Building construction and repair services: Operation of oil and gas fields, namely, construction project management services in the field of construction of oil and gas facilities, consulting services in the field of oil and gas facilities; construction of structures for the production, storage and transportation of crude oil and gas; drilling of wells; extraction of oil; oil pipeline construction; oil pumping; natural resources extraction services, namely, natural gas and oil extraction services; Gasoline refuelling services for motor vehicles; vehicle service stations; maintenance, washing and repair of vehicles and vehicle parts; vehicle oil change services; vehicle breakdown repair services; vehicle greasing and lubrication; engine tuning, namely, maintenance and repair of motor vehicle engines; inflation, repair and fitting of tires; road construction, maintenance and upkeep services; maintenance and troubleshooting of buildings involved in the production, distribution and storage of energy, and installation and repair of apparatus for distributing electricity therein; construction, maintenance and upkeep of refineries and structures for the production, distribution and storage of petroleum, gas and chemical products; rental of drilling rigs and drilling equipment; construction, installation and maintenance of pipelines, oil and gas pipelines; recharging of batteries; recharging of electric vehicles; installation, repair and maintenance of installations for supplying power to and recharging batteries and vehicles; installation of telephone equipment; installation, programming and maintenance of home automation systems in the field of energy; cleaning of contaminants and pollution from industrial installations and sites, equipment and apparatus in the field of energy production
- Class 039 — Transportation and storage services: Transport, delivery, packaging, and storage of goods, namely, gas and chemical products; supply of gas
- Class 040 — Treatment of materials: Treatment of materials; material processing, namely, obtaining metals from native earth materials; oil refinery services; petrochemical refining services, namely, oil refining; processing of refinery products, namely, natural gas, oil, and fuel materials; processing of oil and natural gas; production of energy; processing of oil and natural gas for energy production; generation of solar, water, and wind energy; treatment, recycling and disposal, namely, destruction, of waste and organic waste; oil refining; purification, decontamination and depollution services, being environmental remediation services, namely, treatment of air, water and soil; providing technical information and advice to others relating to energy production; rental of apparatus and installations for generating energy and providing of information relating thereto; rental of chemical treatment apparatus and installations and provision of information relating thereto; mixing lubricants for third parties; technical consultancy relating to the production of energy
Owner
- QATARENERGY, DOHA, QA
- QATARENERGY, DOHA, QA
- Qatar Petroleum, Doha, QA
Prosecution history
- 09 Sept 2026 — NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED
- 09 Sept 2026 — ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED
- 03 Sept 2026 — TEAS CHANGE OF CORRESPONDENCE RECEIVED
- 03 Sept 2026 — APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED
- 03 Sept 2026 — TEAS CHANGE OF OWNER ADDRESS RECEIVED
- 03 Sept 2026 — STATEMENT OF USE PROCESSING COMPLETE
- 14 Aug 2026 — USE AMENDMENT FILED
- 14 Aug 2026 — TEAS STATEMENT OF USE RECEIVED
- 25 Jun 2026 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 25 Jun 2026 — SOU EXTENSION 5 GRANTED
- 09 Feb 2026 — SOU EXTENSION 5 FILED
- 18 Jun 2026 — CASE ASSIGNED TO INTENT TO USE PARALEGAL
- 09 Feb 2026 — SOU TEAS EXTENSION RECEIVED
- 03 Jul 2025 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 03 Jul 2025 — SOU EXTENSION 4 GRANTED