FRONT ROW PLUMBING
Live / Registered — Registered (as of 21 Feb 2023)
What this means for you
Registered since 21 Feb 2023. The owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 97031519
- Registration number
- 6987546
- Mark type
- Stylized text
- Filed
- 16 Sept 2021
- Published for opposition
- 26 Jul 2022
- Registered
- 21 Feb 2023
- Attorney of record
- Brian A. Lincer
Goods and services
- Class 037 — Building construction and repair services: Plumbing; Construction project management services in the field of plumbing; Installation, maintenance and repair of plumbing systems and equipment; Installation, maintenance and repair of water heaters, tankless water heaters, sinks, lavatories, faucets, toilets, tubs, showers, drain/waste/vent pipes, water distribution pipes, building sewer, water service pipe, smart valves, water filters, hose bibs, fuel/gas piping, flushometers, triple sinks, hand washing sinks; Plumbing and gas and water installation; Plumbing contractor services; Plumbing installation advisory services; Plumbing maintenance advisory services; Plumbing repair advisory services; Remodeling of residential and commercial plumbing projects; Advisory services relating to the installation of plumbing; Advisory services relating to the maintenance of plumbing; Advisory services relating to the repair of plumbing; Installation of plumbing; Repair or maintenance of gas water heaters
Owner
- Gucker, Corey Joseph, Durham, NC, US
- Gucker, Corey Joseph, Durham, NC, US
- Gucker, Corey Joseph, Durham, NC, US
Prosecution history
- 21 Feb 2023 — NOTICE OF REGISTRATION CONFIRMATION EMAILED
- 21 Feb 2023 — REGISTERED-PRINCIPAL REGISTER
- 20 Jan 2023 — NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED
- 19 Jan 2023 — ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED
- 18 Jan 2023 — ASSIGNED TO EXAMINER
- 15 Nov 2022 — STATEMENT OF USE PROCESSING COMPLETE
- 26 Oct 2022 — USE AMENDMENT FILED
- 15 Nov 2022 — CASE ASSIGNED TO INTENT TO USE PARALEGAL
- 26 Oct 2022 — TEAS STATEMENT OF USE RECEIVED
- 20 Sept 2022 — NOA E-MAILED - SOU REQUIRED FROM APPLICANT
- 26 Jul 2022 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 26 Jul 2022 — PUBLISHED FOR OPPOSITION
- 06 Jul 2022 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
- 21 Jun 2022 — APPROVED FOR PUB - PRINCIPAL REGISTER
- 20 Jun 2022 — ASSIGNED TO EXAMINER